Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
CARPENTER, INCLUDES FORM WORK$36.21$21.06
ELECTRICIAN$45.00$31.37
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 4 BROOM/ SWEEPER, FORK TRUCK, TRACTOR, BOBCAT/ SKID STEER /SKID LOADER$39.95$25.25
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 3 BOOM TRUCK (NON-SWINGING, NON- POWERED TYPE BOOM)$40.52$25.25
POWER EQUIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 2 TRENCHER (8-FT DIGGING CAPACITY AND SMALLER)$41.25$25.25
UIPMENT OPERATOR: UNDERGROUND CONSTRUCTION (INCLUDING SEWER) GROUP 1 BACKHOE/ EXCAVATOR, BORING MACHINE, BULLDOZER, CRANE, GRADER/ BLADE, LOADER, ROLLER, SCRAPER, TRENCHER (OVER 8 FT. DIGGING CAPACITY)$45.98$25.25
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$35.46$25.25
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$41.32$25.25
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$44.00$25.25
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$45.68$25.25
PER HOUR ABOVE THE GROUP 1 RATE. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, FOURTH OF JULY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$48.98$25.25
IRONWORKER: STRUCTURAL$36.55$35.93
IRONWORKER: REINFORCING$36.55$33.37
LABORER ((5) PIPELAYER)$23.84$13.15
LABORER ((4) GRADE CHECKER)$23.70$13.15
LABORER ((2) MASON TENDER-CEMENT/CONCRETE)$23.53$13.15
LABORER ((1) COMMON OR GENERAL)$23.39$13.15
LABORER: COMMON OR GENERAL; GRADE CHECKER; MASON TENDER - CEMENT/CONCRETE; PIPELAYER (EXCLUDES OPEN CUT CONSTRUCTION)$32.53$13.45
PAINTER: BRUSH, ROLLER AND SPRAY$21.89$11.85
CEMENT MASON/CONCRETE FINISHER$24.64$12.88
PLUMBER/PIPEFITTER$42.29$23.94
TRUCK DRIVER: OFF THE ROAD TRUCK$20.82$3.69
TRUCK DRIVER: DUMP TRUCK$18.00$6.43
LABORER: LANDSCAPE$12.25$0.00
DAILY$33.30$0.75
DAILY$33.55$0.75