Davis-Bacon
ME20260030 (Rev 1)
Coverage: Maine • Cumberland.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| IRONWORKER, REINFORCING | $33.65 | $26.27 |
| TRUCK DRIVER: DUMP TRUCK | $16.21 | $3.27 |
| PAINTER (BRUSH AND ROLLER) | $22.18 | $6.33 |
| OPERATOR: ROLLER | $16.61 | $3.44 |
| OPERATOR: LOADER | $21.15 | $4.33 |
| OPERATOR: CRANE | $24.74 | $8.03 |
| OPERATOR: BULLDOZER | $21.06 | $4.67 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $19.99 | $9.96 |
| LABORER: PIPELAYER | $21.84 | $6.42 |
| LABORER: CONCRETE WORKER (INCLUDES REMOVING FORMS, DEMOLITION OF EXISTING CONCRETE, AND POURING, LEVELING AND FINISHING CONCRETE) | $24.35 | $15.65 |
| LABORER: COMMON OR GENERAL | $15.82 | $5.16 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $13.38 | $1.39 |
| IRONWORKER, STRUCTURAL | $23.47 | $11.63 |
| ELECTRICIAN | $25.24 | $7.01 |
| CARPENTER | $19.51 | $6.24 |