Davis-Bacon
ME20260028 (Rev 1)
Coverage: Maine • Franklin, Knox, Lincoln.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| POWER EQUIPMENT OPERATOR: BULLDOZER | $43.60 | $33.86 |
| POWER EQUIPMENT OPERATOR: BACKHOE,EXCAVATOR, LOADER, TRACKHOE | $43.86 | $33.86 |
| LABORER: COMMON OR GENERAL | $25.40 | $21.28 |
| LABORER: FLAGGER | $25.40 | $21.28 |
| TRUCK DRIVER: DUMP TRUCK | $15.40 | $3.09 |
| OPERATOR: CRANE | $24.57 | $6.89 |
| LABORER: PIPELAYER | $21.96 | $5.99 |
| IRONWORKER, STRUCTURAL | $24.57 | $11.13 |
| ELECTRICIAN | $24.94 | $9.00 |
| CARPENTER, INCLUDES FORM WORK | $20.04 | $10.48 |