Davis-Bacon
MD20260067 (Rev 1)
Coverage: Maryland • Queen Anne's.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| SOFT FLOOR LAYER (CARPET) | $34.12 | $14.64 |
| SPRINKLER FITTER (FIRE SPRINKLERS) | $26.06 | $6.52 |
| SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY) | $18.82 | $1.20 |
| ROOFER | $26.80 | $0.00 |
| PLUMBER, EXCLUDES HVAC PIPE INSTALLATION | $20.48 | $0.00 |
| PLUMBER (HVAC PIPE INSTALLATION ONLY) | $17.60 | $0.00 |
| PAINTER (BRUSH AND ROLLER), EXCLUDES DRYWALL FINISHING/TAPING | $15.12 | $0.88 |
| OPERATOR: LOADER | $20.25 | $2.06 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $18.40 | $4.42 |
| LABORER: PIPELAYER | $16.19 | $2.15 |
| LABORER: COMMON OR GENERAL, INCLUDING BRICK MASON TENDING AND CEMENT MASON TENDING | $11.00 | $1.86 |
| IRONWORKER, ORNAMENTAL | $17.31 | $0.00 |
| ELECTRICIAN | $23.49 | $0.81 |
| DRYWALL HANGER AND METAL STUD INSTALLER | $17.27 | $0.62 |
| DRYWALL FINISHER/TAPER | $19.09 | $5.00 |
| CEMENT MASON/CONCRETE FINISHER | $18.92 | $0.00 |
| CARPENTER, EXCLUDES DRYWALL HANGING, AND METAL STUD INSTALLATION | $21.00 | $3.11 |
| BRICKLAYER, INCLUDES TILE SETTING AND FINISHING | $26.20 | $7.43 |
Related Wage Determinations
View directory →Davis-Bacon
MD20260068 (Rev 1)
Maryland • St Mary's
Davis-Bacon
MD20260069 (Rev 1)
Maryland • Washington
Davis-Bacon
MD20260071 (Rev 1)
Maryland • Calvert, Charles
Davis-Bacon
MD20260072 (Rev 1)
Maryland • Somerset, Wicomico, Worcester
Davis-Bacon
MD20260077 (Rev 1)
Maryland • Talbot
Davis-Bacon
MD20260117 (Rev 1)
Maryland • Harford