Skip to content
Davis-Bacon

KS20260048 (Rev 1)

Coverage: Kansas • Douglas.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ASBESTOS WORKER/HEAT & FROST INSULATOR$45.60$35.47
BRICKLAYER$43.57$23.02
TILE FINISHER$20.74$1.46
TILE SETTER$30.18$13.52
CARPENTER$39.59$22.40
ELECTRICIAN$44.05$20.25
POWER EQUIPMENT OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE)$45.48$22.42
POWER EQUIPMENT OPERATOR: OILER$39.93$22.42
POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER$45.48$22.42
IRONWORKER: ORNAMENTAL, REINFORCING AND STRUCTURAL$39.00$34.25
LABORER: MASON TENDER - BRICK$25.47$11.38
LABORER: COMMON OR GENERAL$31.60$16.95
PAINTER: BRUSH, ROLLER, AND SPRAY$36.18$19.97
PLUMBER$45.90$19.94
PIPEFITTER (HVAC PIPE INSTALLATION ONLY)$45.90$19.94
ROOFER$38.45$22.29
SHEET METAL WORKER (HVAC DUCT INSTALLATION ONLY)$52.18$27.15
SHEET METAL WORKER (EXCLUDES HVAC DUCT INSTALLATION)$52.18$27.15
TRUCK DRIVER: DUMP (ALL TYPES)$25.50$10.38
OPERATOR: ROLLER$33.78$13.64
OPERATOR: LOADER$30.35$12.04
OPERATOR: GRADER/BLADE$31.05$13.26
OPERATOR: FORKLIFT$34.83$14.16
OPERATOR: CRANE$33.19$14.16
OPERATOR: BULLDOZER$33.12$13.96
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$26.69$7.01
LABORER: MASON TENDER - CEMENT/CONCRETE$17.86$1.01
CEMENT MASON/CONCRETE FINISHER$23.49$8.39
TRUCK DRIVER: LOWBOY TRUCK$39.89$15.85
TRUCK DRIVER: SEMI-TRAILER TRUCK$39.89$15.85
PIPEFITTER, EXCLUDES HVAC PIPE INSTALLATION$46.39$20.95

Related Wage Determinations

View directory →