Davis-Bacon
ID20260092 (Rev 1)
Coverage: Idaho • Boise.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| POWER EQUIPMENT OPERATOR: GROUP 8 BULLDOZER | $37.58 | $16.10 |
| BASE POINTS: PASCO ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 |
| TRUCK DRIVER: WATER TRUCK | $18.72 | $9.30 |
| TRUCK DRIVER: OIL DISTRIBUTOR TRUCK | $23.93 | $11.27 |
| TRUCK DRIVER: LOWBOY TRUCK | $26.61 | $13.21 |
| TRUCK DRIVER: DUMP TRUCK | $21.30 | $0.00 |
| TRAFFIC CONTROL: LABORER-CONES/ BARRICADES/BARRELS - SETTER/MOVER/SWEEPER | $16.17 | $4.66 |
| TRAFFIC CONTROL: FLAGGER | $14.02 | $4.66 |
| OPERATOR: SCREED | $19.26 | $4.55 |
| OPERATOR: ROTOMILL | $28.05 | $10.00 |
| OPERATOR: ROLLER (SUBGRADE) | $19.99 | $7.99 |
| OPERATOR: ROLLER | $18.82 | $3.86 |
| OPERATOR: PAVER (ASPHALT, AGGREGATE, AND CONCRETE) | $20.18 | $3.86 |
| OPERATOR: OILER | $21.47 | $5.40 |
| OPERATOR: MECHANIC | $23.55 | $8.54 |
| OPERATOR: LOADER | $22.79 | $5.86 |
| OPERATOR: GRADER/BLADE | $22.33 | $5.71 |
| OPERATOR: FORKLIFT | $23.13 | $9.17 |
| OPERATOR: CRANE | $23.34 | $9.45 |
| OPERATOR: BROOM/SWEEPER | $21.89 | $5.65 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $21.15 | $8.20 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $20.57 | $5.50 |
| LABORER: MASON TENDER - CEMENT/CONCRETE | $15.50 | $5.41 |
| LABORER: GRADE CHECKER | $15.95 | $3.86 |
| LABORER: COMMON OR GENERAL | $15.83 | $4.66 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $21.57 | $8.61 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER | $25.47 | $9.52 |
| ELECTRICIAN | $26.97 | $12.10 |
| CEMENT MASON/CONCRETE FINISHER | $16.00 | $5.41 |
| CARPENTER, EXCLUDES FORM WORK | $23.92 | $9.75 |
| CARPENTER (FORM WORK ONLY) | $26.24 | $9.48 |