Davis-Bacon
ID20260060 (Rev 1)
Coverage: Idaho • Shoshone.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER (FORM WORK ONLY) | $38.87 | $17.84 |
| ELECTRICIAN | $49.55 | $19.09 |
| OVER SCALE | $30.41 | $15.95 |
| OVER SCALE | $29.31 | $15.95 |
| OVER SCALE | $29.04 | $15.95 |
| OVER SCALE | $28.76 | $15.95 |
| OVER SCALE | $28.60 | $15.95 |
| IRONWORKER: REINFORCING AND STRUCTURAL | $43.40 | $30.27 |
| LABORER (PIPELINE ONLY): COMMON | $26.28 | $12.15 |
| BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $25.84 | $13.00 |
| BASE POINTS: SPOKANE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE. ZONE 2: 45 RADIUS MILES AND OVER FROM THE MAIN POST OFFICE | $28.48 | $13.00 |
| BASE POINTS: SPOKANE, PASCO, LEWISTON, WENATCHEE ZONE 1: 0-45 RADIUS MILES FROM THE MAIN POST OFFICE ZONE 2: OVER 45 RADIUS MILES FROM THE MAIN POST OFFICE | $40.89 | $18.64 |
| PLUMBER (ZONE 1) | $37.71 | $23.44 |
| TRUCK DRIVER: WATER TRUCK | $24.48 | $11.67 |
| TRUCK DRIVER: LOWBOY TRUCK | $21.00 | $12.10 |
| OPERATOR: CONCRETE BATCH PLANT | $24.94 | $11.96 |
| OPERATOR: FORKLIFT | $21.20 | $0.00 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $20.97 | $0.00 |
| LABORER: PIPELAYER | $17.67 | $7.26 |
| LABORER: LANDSCAPE | $22.13 | $11.13 |
| LABORER: COMMON OR GENERAL | $24.66 | $8.36 |
| CARPENTER, EXCLUDES FORM WORK | $29.92 | $5.20 |
| TRUCK DRIVER: DUMP (OVER 6 YDS) | $37.02 | $20.93 |
| TRUCK DRIVER: DUMP (6 YDS AND UNDER) | $36.58 | $20.93 |