Davis-Bacon
IA20260067 (Rev 1)
Coverage: Iowa • Harrison.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| ASBESTOS WORKER/HEAT & FROST INSULATOR | $38.26 | $20.54 |
| BOILERMAKER | $48.48 | $33.91 |
| BRICKLAYER | $34.80 | $19.24 |
| TILE SETTER | $34.80 | $19.24 |
| ELECTRICIAN | $46.40 | $20.89 |
| FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY | $55.88 | $38.44 |
| POWER EQUIPMENT OPERATOR: (CLASS 3)- BULLDOZER, LOADER | $32.62 | $21.94 |
| POWER EQUIPMENT OPERATOR: (CLASS 2)- BOBCAT/SKID STEER/SKID LOADER, LOADER(UNDER 35 H.P.) WITH OR WITHOUT ATTACHMENTS, PAVER(ALL TYPES), ROLLER | $34.70 | $21.94 |
| IRONWORKER: STRUCTURAL | $38.82 | $17.04 |
| IRONWORKER: ORNAMENTAL | $35.53 | $24.45 |
| IRONWORKER: REINFORCING | $37.50 | $30.99 |
| CEMENT MASON/CONCRETE FINISHER | $32.29 | $28.45 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $43.20 | $23.25 |
| PLUMBER | $45.20 | $23.25 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT AND UNIT INSTALLATION | $31.07 | $9.72 |
| ROOFER | $20.11 | $4.99 |
| PAINTER: SPRAY | $19.77 | $6.64 |
| PAINTER (BRUSH AND ROLLER) | $21.35 | $8.54 |
| OPERATOR: FORKLIFT | $22.96 | $7.49 |
| OPERATOR: CRANE | $24.20 | $9.62 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $17.41 | $0.00 |
| LABORER: PIPELAYER | $16.11 | $0.00 |
| LABORER: MASON TENDER - BRICK | $14.57 | $0.00 |
| LABORER: COMMON OR GENERAL | $12.81 | $0.00 |
| CARPENTER | $21.61 | $9.92 |