Skip to content
Davis-Bacon

IA20260040 (Rev 1)

Coverage: Iowa • Davis.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
BOILERMAKER$48.48$33.91
CARPENTER (FORM WORK ONLY)$34.25$29.53
FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY$56.30$38.44
POWER EQUIPMENT OPERATOR: CRANE$36.93$21.94
POWER EQUIPMENT OPERATOR: (CLASS 2)- FORKLIFT (OTHER THAN THE ABOVE)$34.70$21.94
POWER EQUIPMENT OPERATOR: (CLASS 1)- FORKLIFT (ON STEEL ERECTION AND MACHINERY MOVING OR HOISTING ABOVE ONE COMPLETE STORY)$35.02$21.94
IRONWORKER: REINFORCING$37.50$30.99
IRONWORKER: ORNAMENTAL$36.30$25.80
LABORER: MASON TENDER - BRICK$28.57$17.53
PAINTER: BRUSH AND ROLLER$32.41$16.30
DRYWALL FINISHER/TAPER$31.82$19.05
PIPEFITTER (INCLUDES HVAC PIPE AND UNIT INSTALLATION)$46.10$27.05
SPRINKLER FITTER (FIRE SPRINKLERS)$45.99$26.42
SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION)$37.12$22.22
ROOFER$14.00$3.91
PLUMBER$31.85$15.12
OPERATOR: LOADER$25.80$17.19
OPERATOR: BULLDOZER$22.31$8.36
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$27.55$22.85
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$27.31$15.35
LABORER: PIPELAYER$18.00$2.70
LABORER: LANDSCAPE$14.81$0.00
LABORER: COMMON OR GENERAL$17.25$6.93
IRONWORKER, STRUCTURAL$25.29$15.89
INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION)$19.04$7.32
ELECTRICIAN, INCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF HVAC/TEMPERATURE CONTROLS$23.58$9.15
CEMENT MASON/CONCRETE FINISHER$21.12$11.07
CARPENTER, INCLUDES ACOUSTICAL CEILING INSTALLATION, AND DRYWALL HANGING (EXCLUDES FORM WORK)$23.30$12.28
BRICKLAYER$25.93$9.70
MILLWRIGHT$35.93$28.05

Related Wage Determinations

View directory →