Davis-Bacon
IA20260037 (Rev 1)
Coverage: Iowa • Cerro Gordo.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| BOILERMAKER | $48.48 | $33.91 |
| BRICKLAYER | $29.80 | $17.16 |
| FOR EMPLOYEES WITH LESS THAN 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; DAY AFTER THANKSGIVING; & CHRISTMAS DAY | $56.30 | $38.44 |
| POWER EQUIPMENT OPERATOR: (CLASS 3)- FORKLIFT (OTHER THAN ABOVE) | $35.29 | $18.35 |
| POWER EQUIPMENT OPERATOR: (CLASS 2)- FORKLIFT (USED FOR STEEL ERECTION OR MACHINERY MOVING) | $37.62 | $18.35 |
| IRONWORKER: STRUCTURAL | $35.53 | $24.45 |
| IRONWORKER: ORNAMENTAL | $36.30 | $25.80 |
| LABORER: MASON TENDER - BRICK | $29.36 | $17.99 |
| PAINTER: BRUSH AND ROLLER | $32.41 | $16.30 |
| PIPEFITTER (HVAC PIPE INSTALLATION ONLY) | $45.20 | $23.25 |
| SHEET METAL WORKER, INCLUDES HVAC DUCT, AND HVAC UNIT INSTALLATION | $22.59 | $6.02 |
| ROOFER | $15.53 | $4.57 |
| PLUMBER | $23.95 | $10.13 |
| OPERATOR: LOADER | $25.36 | $15.62 |
| OPERATOR: CRANE | $21.51 | $6.41 |
| OPERATOR: BULLDOZER | $22.31 | $8.36 |
| OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $25.14 | $18.26 |
| OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE | $26.64 | $14.47 |
| LABORER: PIPELAYER | $18.00 | $2.70 |
| LABORER: COMMON OR GENERAL | $17.64 | $3.57 |
| IRONWORKER, REINFORCING | $24.43 | $16.24 |
| INSULATOR: MECHANICAL (DUCT, PIPE AND MECHANICAL SYSTEM INSULATION) | $17.68 | $4.36 |
| ELECTRICIAN | $25.02 | $9.76 |
| CEMENT MASON/CONCRETE FINISHER | $16.99 | $1.73 |
| CAULKER | $17.21 | $8.18 |
| CARPENTER, INCLUDES DRYWALL HANGING, AND FORM WORK | $18.54 | $2.34 |