Skip to content
Davis-Bacon

DE20260009 (Rev 1)

Coverage: Delaware • Sussex.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
BOILERMAKER$55.00$35.48
BRICKLAYER$34.19$27.98
CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, SCAFFOLD BUILDING, EXCLUDES MASONRY/BRICK, AND EXCLUDES SOFT FLOOR LAYER)$32.87$18.98
SOFT FLOOR LAYER$38.02$25.39
MILLWRIGHT$51.54$39.26
ELECTRICIAN (INCLUDES LOW VOLTAGE WIRING AND INSTALLATION OF ALARMS, HVAC/TEMPERATURE CONTROLS AND SOUND AND COMMUNICATION SYSTEMS)$47.50$35.93
DAYS BEFORE AND THE WORKING DAY AFTER THE HOLIDAY): NEW YEARS'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY AND THE FRIDAY AFTER THANKSGIVING DAY, AND CHRISTMAS DAY$71.85$38.44
PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY, CHRISTMAS DAY, AND ELECTION DAY (PROVIDED THE EMPLOYEE WORKS THE SCHEDULED WORK DAY FOLLOWING THE HOLIDAY.)$48.73$32.23
AYS SHALL BE OBSERVED, AND WHEN WORK IS PERFORMED THEREON IT SHALL BE PAID FOR AT TWICE THE BASE WAGE RATE: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, THANKSGIVING DAY AND CHRISTMAS DAY$41.10$38.23
LABORER: BACKFILLER, JACK HAMMER, MASON TENDER - BRICK, PIPELAYER, SCAFFOLD BUILDER (BRICK AND MASONRY), TAMPER (HAND HELD)$29.45$25.70
LABORER (MASON TENDER - CEMENT/CONCRETE)$31.45$25.70
GLAZIER$49.96$37.56
PLASTERER: FIREPROOFER$38.37$31.64
CEMENT MASON/CONCRETE FINISHER$41.69$27.28
PIPEFITTER: INDUSTRIAL FOOTNOTE A: PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY,INDEPENDENCE DAY, THANKSGIVING DAY,LABOR DAY, CHRISTMAS DAY, AND GENERAL ELECTION DAY$56.43$43.35
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION AND EXCLUDES INDUSTRIAL WORK)$42.62$22.77
SPRINKLER FITTER (FIRE SPRINKLERS)$46.47$29.56
SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION)$33.63$40.60
TILE SETTER$57.98$1.11
TILE FINISHER$35.40$4.31
ROOFER, EXCLUDES INSTALLATION OF METAL ROOFS$27.98$27.90
ROOFER (INSTALLATION OF METAL ROOFS ONLY)$39.09$30.77
PLUMBER$45.40$16.23
PAINTER (BRUSH AND ROLLER)$40.57$0.94
OPERATOR: CRANE$31.59$16.83
OPERATOR: BULLDOZER$25.89$0.00
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$36.08$12.02
LABORER: COMMON OR GENERAL$24.45$8.65
IRONWORKER, STRUCTURAL$43.59$7.41

Related Wage Determinations

View directory →