Davis-Bacon
CT20260023 (Rev 2)
Coverage: Connecticut • New Haven.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS) | $48.81 | $33.65 |
| BRICKLAYER | $45.56 | $36.94 |
| CEMENT MASON/CONCRETE FINISHER | $45.56 | $36.94 |
| CARPENTER (INCLUDES ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, METAL STUD INSTALLATION, SOFT FLOOR LAYER - VINYL AND RESILIENT) | $42.03 | $29.19 |
| FLOOR LAYER: CARPET ONLY | $42.03 | $29.19 |
| FLOOR LAYER: HARDWOOD FLOORS ONLY | $42.03 | $29.19 |
| CARPENTER (SCAFFOLD BUILDER) | $42.03 | $29.19 |
| SOFT FLOOR LAYER | $42.03 | $29.19 |
| MILLWRIGHT | $45.14 | $30.24 |
| ELECTRICIAN | $46.48 | $38.05 |
| ELECTRICIAN (ALARM INSTALLATION ONLY) | $46.48 | $38.05 |
| ELECTRICIAN: COMMUNICATION TECHNICIAN | $46.48 | $38.05 |
| ELECTRICIAN (LOW VOLTAGE WIRING ONLY) | $46.48 | $38.05 |
| ELECTRICIAN (HVAC/TEMPERATURE CONTROLS INSTALLATION) | $47.40 | $36.74 |
| ULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY | $66.72 | $38.44 |
| GIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $51.92 | $29.80 |
| GIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $50.22 | $29.80 |
| GIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $56.79 | $29.80 |
| GIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY | $53.33 | $29.80 |
| IRONWORKER: REINFORCING, STRUCTURAL, ORNAMENTAL | $45.25 | $43.62 |
| LABORER: MASON TENDER- CEMENT/CONCRETE | $35.70 | $28.85 |
| GLAZIER | $43.13 | $26.75 |
| PAINTER: BRUSH AND ROLLER | $39.57 | $26.75 |
| DRYWALL FINISHER/TAPER | $40.32 | $26.75 |
| PLUMBER | $50.58 | $35.85 |
| PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION) | $50.58 | $35.85 |
| ROOFER: SLATE AND TILE | $45.65 | $23.53 |
| ROOFER: COMPOSITION | $45.15 | $23.53 |
| SHEET METAL WORKER (INCLUDING HVAC UNIT INSTALLATION) | $44.70 | $44.50 |
| SHEET METAL WORKER (METAL FLASHING AND HVAC DUCT INSTALLATION ONLY) | $44.70 | $44.50 |
| SHEET METAL WORKER (METAL ROOFS INSTALLATION) | $44.70 | $44.50 |
| LABORER: COMMON OR GENERAL | $27.85 | $18.04 |
| TRUCK DRIVER: DUMP TRUCK | $36.39 | $32.68 |
Related Wage Determinations
View directory →Davis-Bacon
CT20260022 (Rev 2)
Connecticut • Middlesex
Davis-Bacon
CT20260017 (Rev 2)
Connecticut • New London
Davis-Bacon
CT20260020 (Rev 2)
Connecticut • Fairfield
Davis-Bacon
CT20260016 (Rev 2)
Connecticut • New Haven
Davis-Bacon
CT20260008 (Rev 2)
Connecticut • Hartford
Davis-Bacon
CT20260003 (Rev 2)
Connecticut • Hartford