Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
HEAT & FROST INSULATOR (INCLUDES DUCT, PIPE AND MECHANICAL SYSTEMS)$48.81$33.65
BRICKLAYER$45.56$36.94
BRICK POINTER/CAULKER/CLEANER$45.56$36.94
CEMENT MASON/CONCRETE FINISHER$45.56$36.94
FLOOR LAYER: CARPET ONLY$42.03$29.19
FLOOR LAYER: HARDWOOD FLOORS ONLY$42.03$29.19
CARPENTER (SCAFFOLD BUILDER)$42.03$29.19
CARPENTER (INCLUDING ACOUSTICAL CEILING INSTALLATION, DRYWALL HANGING, FORM WORK, AND METAL STUD INSTALLATION)$42.03$29.19
ELECTRICIAN (INCLUDING LOW VOLTAGE WIRING)$48.25$36.67
ULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY$66.72$38.44
GIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY$51.92$29.80
GIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY$50.22$29.80
GIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY$56.79$29.80
GIVING DAY AND CHRISTMAS DAY, PROVIDED THE EMPLOYEE WORKS 3 DAYS DURING THE WEEK IN WHICH THE HOLIDAY FALLS, IF SCHEDULED, AND IF SCHEDULED, THE WORKING DAY BEFORE AND THE WORKING DAY AFTER THE HOLIDAY$53.33$29.80
IRONWORKER: REINFORCING, STRUCTURAL, ORNAMENTAL$45.25$43.62
LABORER: MASON TENDER-CEMENT/CONCRETE$35.70$28.85
LABORER: COMMON OR GENERAL$35.70$28.85
GLAZIER$43.13$26.75
PAINTER: BRUSH AND ROLLER$39.57$26.75
DRYWALL FINISHER/TAPER$40.32$26.75
PLUMBER$50.58$35.85
PIPEFITTER$50.58$35.85
PLUMBER: HVAC PIPE INSTALLATION$50.58$35.85
ROOFER: SLATE AND TILE$45.65$23.53
ROOFER: COMPOSITION$45.15$23.53
ROOFER (INSTALLATION OF METAL ROOFS ONLY)$45.15$23.53
SPRINKLER FITTER$53.76$33.44
SHEET METAL WORKER (INCLUDING HVAC UNIT INSTALLATION)$44.70$44.50
SHEET METAL WORKER (METAL FLASHING AND HVAC DUCT INSTALLATION ONLY)$44.70$44.50
TRUCK DRIVER: DUMP TRUCK$36.39$32.68