Skip to content
Davis-Bacon

CO20260017 (Rev 1)

Coverage: Colorado • Boulder.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
ASBESTOS WORKER/HEAT & FROST INSULATOR - MECHANICAL (DUCT, PIPE & MECHANICAL SYSTEM INSULATION)$36.98$16.82
MILLWRIGHT$42.10$19.02
ELECTRICIAN$46.80$19.53
ULAR HOURLY RATE FOR ALL HOURS WORKED. B. PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERANS' DAY; THANKSGIVING DAY; THE FRIDAY AFTER THANKSGIVING DAY; AND CHRISTMAS DAY$56.57$38.44
POWER EQUIPMENT OPERATOR: CRANE (91 TO 140 TONS)$37.34$15.20
POWER EQUIPMENT OPERATOR: CRANE (51 TO 90 TONS)$36.09$15.20
IRONWORKER: ORNAMENTAL$39.21$12.50
IRONWORKER, STRUCTURAL$39.21$12.50
PAINTER: BRUSH, ROLLER AND SPRAY (EXCLUDES DRYWALL FINISHING/TAPING)$27.41$11.56
SOFT FLOOR LAYER (VINYL AND CARPET)$18.25$14.33
PLUMBER (EXCLUDES HVAC DUCT, PIPE AND UNIT INSTALLATION)$47.23$21.68
PIPEFITTER (INCLUDES HVAC PIPE INSTALLATION; EXCLUDES HVAC DUCT AND UNIT INSTALLATION)$45.55$22.11
SPRINKLER FITTER (FIRE SPRINKLERS)$48.60$27.57
SHEET METAL WORKER (INCLUDES HVAC DUCT INSTALLATION; EXCLUDES HVAC PIPE AND UNIT INSTALLATION)$43.05$22.65
TRUCK DRIVER: DUMP TRUCK$17.34$0.00
ROOFER$17.14$0.00
OPERATOR: GRADER/BLADE$21.50$0.00
OPERATOR: BOBCAT/SKID STEER/SKID LOADER$18.58$2.42
OPERATOR: BACKHOE/EXCAVATOR/TRACKHOE$20.78$5.78
LABORER: PIPELAYER$16.96$3.68
LABORER: MASON TENDER - CEMENT/CONCRETE$16.00$0.00
LABORER: MASON TENDER - BRICK$15.99$0.00
LABORER: COMMON OR GENERAL$11.76$0.00
HVAC MECHANIC: HVAC UNIT INSTALLATION, EXCLUDES PIPE AND DUCT INSTALLATION$25.23$9.36
DRYWALL HANGER$19.24$6.30
DRYWALL FINISHER/TAPER$20.82$6.37
CEMENT MASON/CONCRETE FINISHER$20.31$6.76
CARPENTER, EXCLUDES DRYWALL HANGING$22.66$6.79
BRICKLAYER$21.96$0.00

Related Wage Determinations

View directory →