Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| CARPENTER (FORM WORK ONLY) | $33.11 | $12.17 |
| BIJOU DENVER - ELLSWORTH AVENUE & BROADWAY FT. COLLINS - PROSPECT & COLLEGE GRAND JUNCTION - 12TH & NORTH AVENUE PUEBLO - I-25 & HIGHWAY 50 ALL WORK OUTSIDE OF THESE AREAS SHALL BE PAID ZONE 2 RATES | $29.42 | $10.08 |
| BIJOU DENVER - ELLSWORTH AVENUE & BROADWAY FT. COLLINS - PROSPECT & COLLEGE GRAND JUNCTION - 12TH & NORTH AVENUE PUEBLO - I-25 & HIGHWAY 50 ALL WORK OUTSIDE OF THESE AREAS SHALL BE PAID ZONE 2 RATES | $26.42 | $9.93 |
| POWER EQUIPMENT OPERATOR: (6)-CRANE (91-140 TONS) | $35.28 | $15.20 |
| POWER EQUIPMENT OPERATOR: (5)-MOTOR GRADER (BLADE-FINISH) (DOUGLAS COUNTY) | $35.58 | $15.20 |
| POWER EQUIPMENT OPERATOR: (5)-DRILL RIG CAISSON (WATSON 2500 SIMILAR OR LARGER), CRANE (51-90 TONS), SCRAPER (40 CU.YD AND OVER),) | $35.41 | $15.20 |
| POWER EQUIPMENT OPERATOR: (4)-LOADER (OVER 6 CU. YD) (DENVER COUNTY) | $35.20 | $15.20 |
| POWER EQUIPMENT OPERATOR: (4)-CRANE (50 TONS AND UNDER), SCRAPER (SINGLE BOWL, UNDER 40 CU. YD) | $35.78 | $15.20 |
| POWER EQUIPMENT OPERATOR: (3)-MOTOR GRADER (BLADE-ROUGH) (DOUGLAS COUNTY) | $33.19 | $15.20 |
| POWER EQUIPMENT OPERATOR: (3)-LOADER (UNDER 6 CU. YD.) (DENVER COUNTY) | $35.03 | $15.20 |
| R: (3)-HYDRAULIC BACKHOE (WHEEL MOUNTED, UNDER 3/4 YDS), HYDRAULIC BACKHOE (BACKHOE/LOADER COMBINATION), DRILL RIG CAISSON (SMALLER THAN WATSON 2500 AND SIMILAR), LOADER (UP TO AND INCLUDING 6 CU. YD.) | $35.03 | $15.20 |
| TRUCK DRIVER: WATER TRUCK (DOUGLAS) | $19.46 | $2.58 |
| TRUCK DRIVER: WATER TRUCK (DENVER) | $26.27 | $5.27 |
| TRUCK DRIVER: TRUCK MOUNTED ATTENUATOR | $12.43 | $3.22 |
| TRUCK DRIVER: SEMI/TRAILER TRUCK | $18.39 | $4.13 |
| TRUCK DRIVER: PICKUP AND PILOT CAR (DOUGLAS) | $16.43 | $3.68 |
| TRUCK DRIVER: PICKUP AND PILOT CAR (DENVER) | $14.24 | $3.77 |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALTY & HOISTING TRUCK (DOUGLAS) | $20.05 | $2.88 |
| TRUCK DRIVER: MULTI-PURPOSE SPECIALTY & HOISTING TRUCK (DENVER) | $17.49 | $3.17 |
| TRUCK DRIVER: MECHANIC | $26.48 | $3.50 |
| TRUCK DRIVER: LOWBOY TRUCK | $17.25 | $5.27 |
| TRUCK DRIVER: DUMP TRUCK (DOUGLAS) | $16.39 | $5.27 |
| TRUCK DRIVER: DUMP TRUCK (DENVER) | $15.27 | $5.27 |
| TRUCK DRIVER: DISTRIBUTOR (DOUGLAS) | $16.98 | $5.27 |
| TRUCK DRIVER: DISTRIBUTOR (DENVER) | $17.81 | $5.82 |
| TRAFFIC SIGNALIZATION: GROUNDSMAN, (DOUGLAS) | $18.67 | $7.17 |
| TRAFFIC SIGNALIZATION: GROUNDSMAN (DENVER) | $17.90 | $3.41 |
| POWER EQUIPMENT OPERATOR: TRACTOR | $13.13 | $2.95 |
| POWER EQUIPMENT OPERATOR: SCREED (DOUGLAS) | $29.99 | $1.40 |
| POWER EQUIPMENT OPERATOR: SCREED (DENVER) | $22.67 | $8.38 |
| POWER EQUIPMENT OPERATOR: ROTOMILL | $16.22 | $4.41 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (DOUGLAS) | $22.78 | $4.86 |
| POWER EQUIPMENT OPERATOR: ROLLER/COMPACTOR (DIRT AND GRADE COMPACTION) (DENVER) | $20.30 | $5.51 |
| POWER EQUIPMENT OPERATOR: OILER (DOUGLAS) | $24.90 | $7.67 |
| POWER EQUIPMENT OPERATOR: OILER (DENVER) | $23.73 | $8.41 |
| POWER EQUIPMENT OPERATOR: MECHANIC (DOUGLAS) | $23.88 | $8.22 |
| POWER EQUIPMENT OPERATOR: MECHANIC (DENVER) | $22.89 | $8.72 |
| POWER EQUIPMENT OPERATOR: LOADER (FRONT END) (DOUGLAS) | $21.67 | $8.22 |
| POWER EQUIPMENT OPERATOR: GUARDRAIL/POST DRIVER | $16.07 | $4.41 |
| POWER EQUIPMENT OPERATOR: GRADER/BLADE (DENVER) | $22.67 | $8.72 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $15.91 | $4.68 |
| POWER EQUIPMENT OPERATOR: DRILL (DOUGLAS) | $20.71 | $2.66 |
| POWER EQUIPMENT OPERATOR: DRILL (DENVER) | $20.48 | $4.71 |
| POWER EQUIPMENT OPERATOR: CONCRETE PUMP | $21.60 | $5.21 |
| POWER EQUIPMENT OPERATOR: BULLDOZER | $26.90 | $5.59 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (DOUGLAS) | $22.96 | $8.22 |
| POWER EQUIPMENT OPERATOR: BROOM/SWEEPER (DENVER) | $22.47 | $8.72 |
| POWER EQUIPMENT OPERATOR: BOOM | $22.67 | $8.72 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID LOADER | $15.37 | $4.28 |
| POWER EQUIPMENT OPERATOR: BACKHOE/TRACKHOE (DOUGLAS) | $23.82 | $6.00 |
| POWER EQUIPMENT OPERATOR: ASPHALT SPREADER | $22.67 | $8.72 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (DOUGLAS) | $23.63 | $6.43 |
| POWER EQUIPMENT OPERATOR: ASPHALT ROLLER (DENVER) | $23.13 | $7.55 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVER (DOUGLAS) | $25.44 | $3.50 |
| POWER EQUIPMENT OPERATOR: ASPHALT PAVER (DENVER) | $24.97 | $6.13 |
| POWER EQUIPMENT OPERATOR: ASPHALT LAYDOWN (DENVER) | $22.67 | $8.72 |
| PAINTER (SPRAY ONLY) | $16.99 | $2.87 |
| LABORER: TRAFFIC CONTROL (SETS UP/MOVES BARRELS, CONES, INSTALL SIGNS, ARROW BOARDS AND PLACE STATIONARY FLAGS)(EXCLUDES FLAGGERS) | $12.43 | $3.22 |
| LABORER: TRAFFIC CONTROL (FLAGGER) | $9.55 | $3.05 |
| LABORER: PIPELAYER (DOUGLAS) | $16.30 | $2.18 |
| LABORER: PIPELAYER (DENVER) | $13.55 | $2.41 |
| LABORER: MASON TENDER-CEMENT/CONCRETE (DOUGLAS) | $16.29 | $4.25 |
| LABORER: MASON TENDER-CEMENT/CONCRETE (DENVER) | $16.96 | $4.04 |
| LABORER: LANDSCAPE AND IRRIGATION | $12.26 | $3.16 |
| LABORER: CONCRETE SAW (HAND HELD) | $16.29 | $6.14 |
| LABORER: ASPHALT SPREADER | $18.58 | $4.65 |
| LABORER: ASPHALT SHOVELER | $21.21 | $4.25 |
| LABORER: ASPHALT RAKER | $16.29 | $4.25 |
| LABORER, COMMON OR GENERAL (DOUGLAS) | $16.29 | $4.25 |
| LABORER, COMMON OR GENERAL (DENVER) | $16.76 | $6.77 |
| IRONWORKER: STRUCTURAL (INCLUDES LINK/CYCLONE FENCE ERECTION, EXCLUDES GUARDRAIL INSTALLATION) | $18.22 | $6.01 |
| IRONWORKER: REINFORCING (EXCLUDES GUARDRAIL INSTALLATION) | $16.69 | $5.45 |
| HIGHWAY/PARKING LOT STRIPING:PAINTER (DENVER) | $12.62 | $3.21 |
| HIGHWAY/PARKING LOT STRIPING: PAINTER (DOUGLAS) | $13.89 | $3.21 |
| GUARDRAIL INSTALLER | $12.89 | $3.20 |
| FENCE ERECTOR (EXCLUDES LINK/CYCLONE FENCE ERECTION) | $13.02 | $3.20 |
| ELECTRICIAN (EXCLUDES TRAFFIC SIGNAL INSTALLATION) | $35.13 | $6.83 |
| CEMENT MASON/CONCRETE FINISHER (DOUGLAS) | $18.75 | $3.00 |
| CEMENT MASON/CONCRETE FINISHER (DENVER) | $20.18 | $5.75 |
| CARPENTER (EXCLUDES FORM WORK) | $19.27 | $5.08 |
Related Wage Determinations
View directory →Davis-Bacon
CO20260007 (Rev 1)
Colorado • Boulder
Davis-Bacon
CO20260010 (Rev 1)
Colorado • Baca, Bent, Costilla +6
Davis-Bacon
CO20260023 (Rev 1)
Colorado • Jefferson
Davis-Bacon
CO20260008 (Rev 1)
Colorado • El Paso, Pueblo, Teller
Davis-Bacon
CO20260020 (Rev 1)
Colorado • Denver
Davis-Bacon
CO20260028 (Rev 1)
Colorado • Teller