Davis-Bacon
CA20260020 (Rev 3)
Coverage: California • Inyo, Kern, Mono.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| INSULATOR/ASBESTOS WORKER: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS INYO AND KERN | $56.32 | $26.52 |
| FIRE STOP TECHNICIAN: APPLICATION OF FIRESTOPPING MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS (INYO AND KERN) | $39.94 | $20.65 |
| INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (INYO AND KERN) | $23.52 | $13.37 |
| ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (MONO) | $64.56 | $25.07 |
| BOILERMAKER (INYO AND KERN) | $51.98 | $42.11 |
| BOILERMAKER (MONO COUNTY) | $45.60 | $38.99 |
| ABOVE THE STANDARD SAN BERNARDINO/RIVERSIDE COUNTY HOURLY WAGE RATE | $45.53 | $20.29 |
| TERRAZZO WORKER/SETTER | $49.62 | $15.26 |
| TERRAZZO FINISHER | $42.11 | $14.67 |
| TILE LAYER | $48.29 | $19.18 |
| TILE FINISHER (KERN) | $37.96 | $13.77 |
| MARBLE FINISHER (KERN) | $43.38 | $15.36 |
| RATES' COLUMN ARE PER DAY | $418.96 | $26.18 |
| RATES' COLUMN ARE PER DAY | $442.96 | $26.18 |
| RATES' COLUMN ARE PER DAY | $450.96 | $26.18 |
| RATES' COLUMN ARE PER DAY | $901.92 | $26.18 |
| DRYWALL (STOCKER/SCRAPPER) | $21.45 | $11.27 |
| DRYWALL (DRYWALL INSTALLER/LATHER) | $52.24 | $26.18 |
| PER HOUR ADDITIONAL | $42.80 | $16.28 |
| PER HOUR ADDITIONAL | $51.03 | $16.28 |
| PER HOUR ADDITIONAL | $38.92 | $16.28 |
| PER HOUR ADDITIONAL | $51.29 | $16.28 |
| CARPENTER: (05) TABLE POWER SAW OPERATOR | $52.13 | $16.28 |
| PER HOUR ADDITIONAL | $51.17 | $16.28 |
| PER HOUR ADDITIONAL | $51.73 | $16.28 |
| PER HOUR ADDITIONAL | $52.10 | $16.48 |
| MODULAR FURNITURE INSTALLER | $25.00 | $13.06 |
| ELECTRICIAN (CHINA LAKE NAVAL WEAPONS CENTER, EDWARDS AFB) | $65.40 | $22.15 |
| CABLE SPLICER (CHINA LAKE NAVAL WEAPONS CENTER, EDWARDS AFB) | $71.07 | $22.32 |
| CABLE SPLICER (REMAINDER OF KERN COUNTY) | $62.32 | $22.06 |
| SUPPLY; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, CONDUIT SYSTEMS, LINE VOLTAGE WORK, AND ENERGY MANAGEMENT SYSTEMS. FIRE ALARM WORK SHALL BE PERFORMED AT THE CURRENT INSIDE WIREMAN TOTAL COST PACKAGE | $46.26 | $21.03 |
| SUPPLY; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, CONDUIT SYSTEMS, LINE VOLTAGE WORK, AND ENERGY MANAGEMENT SYSTEMS. FIRE ALARM WORK SHALL BE PERFORMED AT THE CURRENT INSIDE WIREMAN TOTAL COST PACKAGE | $52.39 | $21.21 |
| SUPPLY; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, CONDUIT SYSTEMS, LINE VOLTAGE WORK, AND ENERGY MANAGEMENT SYSTEMS. FIRE ALARM WORK SHALL BE PERFORMED AT THE CURRENT INSIDE WIREMAN TOTAL COST PACKAGE | $55.90 | $21.32 |
| PER HOUR TO THE CURRENT WAGE SCALE | $53.15 | $29.07 |
| tes Fringes LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | $40.76 | $21.76 |
| D & UNDERGROUND DISTRIBUTION LINE EQUIPMENT) HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | $53.30 | $22.26 |
| INE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY | $70.16 | $24.71 |
| FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY | $69.43 | $38.44 |
| OPERATOR, POWER EQUIPMENT: (6) BARGE MATE (DREDGING) | $61.34 | $40.95 |
| OPERATOR, POWER EQUIPMENT: (5) FIREMAN-OILER, DECKHAND, BARGEMAN, LEVEEHAND (DREDGING) | $60.73 | $40.95 |
| OPERATOR, POWER EQUIPMENT: (4) WINCH OPERATOR (STERN WINCH ON DREDGE) (DREDGING) | $61.27 | $40.95 |
| OPERATOR, POWER EQUIPMENT: (3) DECKMATE (DREDGING) | $61.82 | $40.95 |
| OPERATOR, POWER EQUIPMENT: (2) DREDGE DOZER (DREDGING) | $61.93 | $40.95 |
| OPERATOR, POWER EQUIPMENT: (1) LEVERMAN (DREDGING) | $67.90 | $40.95 |
| per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator | $66.91 | $33.20 |
| per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator | $66.79 | $33.20 |
| per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator | $66.68 | $33.20 |
| per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator | $66.46 | $33.20 |
| per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator | $66.32 | $33.20 |
| per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator | $66.03 | $33.20 |
| per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator | $65.25 | $33.20 |
| operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons) | $70.75 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $69.75 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $68.75 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $67.75 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $66.75 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $66.58 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $66.41 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $66.29 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $66.18 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $65.96 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $65.82 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $65.53 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $64.75 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $67.91 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $67.79 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $67.68 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $67.58 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $67.41 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $67.29 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $67.18 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $67.08 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $66.71 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $64.67 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $64.18 | $33.20 |
| PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR | $63.40 | $33.20 |
| IRONWORKER (INYO AND MONO COUNTIES) | $43.75 | $34.45 |
| IRONWORKER (KERN COUNTY) | $50.70 | $35.15 |
| LABORER, TUNNEL: GROUP 4 GROUP 4: DIAMOND DRILLER; SANDBLASTER; SHAFT AND RAISE WORK (KERN COUNTY) | $55.07 | $25.74 |
| MACHINES; POWDER PERSON (PRIMER HOUSE); PRIMER PERSON; SANDBLASTER; SHOTCRETE PERSON; STEEL FORM RAISER AND SETTER; TIMBER PERSON, RETIMBER PERSON, WOOD OR STEEL; TUNNEL CONCRETE FINISHER (KERN COUNTY) | $54.38 | $25.74 |
| LETENDER; LOADING AND UNLOADING AGITATOR CARS; VIBRATOR PERSON, JACK HAMMER, PNEUMATIC TOOLS (EXCEPT DRILLER); BULL GANG MUCKER, TRACK PERSON; CONCRETE CREW, INCLUDING RODDER AND SPREADER (KERN COUNTY) | $53.92 | $25.74 |
| ERSON AND SWITCH PERSON ON TUNNEL WORK); TUNNEL MATERIALS HANDLING PERSON; NIPPER; POT TENDER, USING MASTIC OR OTHER MATERIALS (FOR EXAMPLE, BUT NOT BY WAY OF LIMITATION, SHOTCRETE, ETC.) (KERN COUNTY) | $53.60 | $25.74 |
| EXCLUDING JACKHAMMER, WHETHER CORE, DIAMOND, WAGON, TRACK, MULTIPLE UNIT, AND ANY AND ALL OTHER TYPES OF MECHANICAL DRILLS WITHOUT REGARD TO THE FORM OF MOTIVE POWER; TOXIC WASTE REMOVAL (KERN COUNTY) | $49.48 | $25.95 |
| MATERIAL FROM WHICH THE TUBULAR MATERIAL IS FABRICATED; NO-JOINT PIPE AND STRIPPING OF SAME; PREFABRICATED MANHOLE INSTALLER; SANDBLASTER (NOZZLE PERSON), WATER BLASTING, PORTA SHOT-BLAST (KERN COUNTY) | $49.13 | $25.95 |
| K SLINGER; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; STEEL HEADERBOARD AND GUIDELINE SETTER; TAMPER, BARKO, WACKER AND SIMILAR TYPE; TRENCHING MACHINE, HAND-PROPELLED (KERN COUNTY) | $47.58 | $25.95 |
| AND INSTALLER(LEAD); TANK SCALER AND CLEANER; TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDER; UNDERGROUND LABORER, INCLUDING CAISSON BELLOWER (KERN COUNTY) | $47.03 | $25.95 |
| ND SIGNALING; SCALER; SLIP FORM RAISER; TAR AND MORTAR; TOOL CRIB OR TOOL HOUSE LABORER; TRAFFIC CONTROL BY ANY METHOD; WINDOW CLEANER; WIRE MESH PULLING - ALL CONCRETE POURING OPERATIONS (KERN COUNTY) | $46.48 | $25.95 |
| BRICK TENDER (KERN COUNTY) | $42.60 | $22.13 |
| URE AND DISPOSAL OF ASBESTOS- CONTAINING MATERIALS AND TOXIC WASTE BY HAND OR WITH EQUIPMENT OR MACHINERY; SCAFFOLDING, FABRICATION OF TEMPORARY WOODEN BARRIERS AND ASSEMBLY OF DECONTAMINATION STATIONS | $46.48 | $25.93 |
| LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE | $51.39 | $23.77 |
| LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE | $54.93 | $23.77 |
| LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE | $55.88 | $23.77 |
| LABORER, TUNNEL: GROUP 4: DIAMOND DRILLER; SANDBLASTER; SHAFT AND RAISE WORK (INYO AND MONO COUNTIES) | $55.07 | $25.74 |
| OWDER PERSON (PRIMER HOUSE); PRIMER PERSON; SANDBLASTER; SHOTCRETE PERSON; STEEL FORM RAISER AND SETTER; TIMBER PERSON, RETIMBER PERSON, WOOD OR STEEL; TUNNEL CONCRETE FINISHER (INYO AND MONO COUNTIES) | $54.38 | $25.74 |
| OADING AND UNLOADING AGITATOR CARS; VIBRATOR PERSON, JACK HAMMER, PNEUMATIC TOOLS (EXCEPT DRILLER); BULL GANG MUCKER, TRACK PERSON; CONCRETE CREW, INCLUDING RODDER AND SPREADER (INYO AND MONO COUNTIES) | $53.92 | $25.74 |
| ITCH PERSON ON TUNNEL WORK); TUNNEL MATERIALS HANDLING PERSON; NIPPER; POT TENDER, USING MASTIC OR OTHER MATERIALS (FOR EXAMPLE, BUT NOT BY WAY OF LIMITATION, SHOTCRETE, ETC.) (INYO AND MONO COUNTIES) | $53.60 | $25.74 |
| JACKHAMMER, WHETHER CORE, DIAMOND, WAGON, TRACK, MULTIPLE UNIT, AND ANY AND ALL OTHER TYPES OF MECHANICAL DRILLS WITHOUT REGARD TO THE FORM OF MOTIVE POWER; TOXIC WASTE REMOVAL (INYO AND MONO COUNTIES) | $49.48 | $25.95 |
| OM WHICH THE TUBULAR MATERIAL IS FABRICATED; NO-JOINT PIPE AND STRIPPING OF SAME; PREFABRICATED MANHOLE INSTALLER; SANDBLASTER (NOZZLE PERSON), WATER BLASTING, PORTA SHOT-BLAST (INYO AND MONO COUNTIES) | $49.13 | $25.95 |
| ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; STEEL HEADERBOARD AND GUIDELINE SETTER; TAMPER, BARKO, WACKER AND SIMILAR TYPE; TRENCHING MACHINE, HAND-PROPELLED (INYO AND MONO COUNTIES) | $47.58 | $25.95 |
| ER(LEAD); TANK SCALER AND CLEANER; TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDER; UNDERGROUND LABORER, INCLUDING CAISSON BELLOWER (INYO AND MONO COUNTIES) | $47.03 | $25.95 |
| G; SCALER; SLIP FORM RAISER; TAR AND MORTAR; TOOL CRIB OR TOOL HOUSE LABORER; TRAFFIC CONTROL BY ANY METHOD; WINDOW CLEANER; WIRE MESH PULLING - ALL CONCRETE POURING OPERATIONS (INYO AND MONO COUNTIES) | $46.48 | $25.95 |
| BRICK TENDER (INYO AND MONO COUNTIES) | $42.60 | $22.13 |
| OUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND MARKINGS, INCLUDING TRAFFIC CONTROL; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT | $54.35 | $23.97 |
| MANENTLY AFFIXED ROADSIDE AND PARKING DELINEATION BARRICADES, FENCING, CABLE ANCHOR, GUARD RAIL, REFERENCE SIGNS, MONUMENT MARKERS; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT; POWER BROOM SWEEPER | $52.61 | $23.97 |
| AND PREPARATION OF SURFACE FOR COATINGS. TRAFFIC CONTROL PERSON: CONTROLLING AND DIRECTING TRAFFIC THROUGH BOTH CONVENTIONAL AND MOVING LANE CLOSURES; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT | $50.60 | $23.97 |
| INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN PARKING LOTS, GAME COURTS AND PLAYGROUNDS; CARSTOPS; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT; EQUIPMENT REPAIR TECHNICIAN | $49.30 | $23.97 |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC TRACKING LOCATOR | $51.96 | $20.86 |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL DIRECTIONAL DRILL OPERATOR | $49.96 | $20.86 |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE OPERATOR/HAULER | $48.11 | $20.86 |
| LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW LABORER | $47.94 | $20.86 |
| DRYWALL FINISHER/TAPER | $45.20 | $26.82 |
| PAINTERS: INCLUDING LEAD ABATEMENT: (5) INDUSTRIAL | $41.42 | $19.04 |
| PAINTERS: INCLUDING LEAD ABATEMENT: (4) ALL OTHER WORK | $34.08 | $18.50 |
| PAINTERS: INCLUDING LEAD ABATEMENT: (1) JOURNEYMAN PAINTER | $34.08 | $18.50 |
| GLAZIER | $44.33 | $28.88 |
| SOFT FLOOR LAYER | $45.15 | $19.43 |
| ADDITIONAL PER HOUR | $47.37 | $19.64 |
| CEMENT MASON/CONCRETE FINISHER | $47.70 | $27.07 |
| PLUMBER (SEWER & STORM DRAIN WORK) | $48.84 | $23.58 |
| PLUMBER (LANDSCAPE/IRRIGATION FITTER) | $44.75 | $26.20 |
| ABOVE THE REGULAR RATE OF PAY FOR THAT DAY | $68.73 | $26.81 |
| ABOVE THE REGULAR RATE OF PAY FOR THAT DAY | $72.23 | $26.81 |
| ABOVE THE REGULAR RATE OF PAY FOR THAT DAY | $61.73 | $26.81 |
| PER HOUR ADDITIONAL | $45.76 | $16.86 |
| SPRINKLER FITTER | $50.79 | $29.80 |
| EL WORK (LOS ANGELES (SOUTH OF A STRAIGHT LINE DRAWN BETWEEN GORMAN AND BIG PINES)AND CATALINA ISLAND, INYO, KERN (NORTHEAST PART, EAST OF HWY 395), MONO ORANGE, RIVERSIDE, AND SAN BERNARDINO COUNTIES) | $59.31 | $30.43 |
| tes Fringes SHEET METAL WORKER (KERN (EXCLUDING PORTION EAST OF HWY 395) & LOS ANGELES (NORTH OF A STRAIGHT LINE DRAWN BETWEEN GORMAN AND BIG PINES INCLUDING CITIES OF LANCASTER AND PALMDALE) COUNTIES) | $45.98 | $29.24 |
| TRUCK DRIVER GROUP 7 | $42.37 | $35.69 |
Related Wage Determinations
View directory →Davis-Bacon
CA20260009 (Rev 1)
California • Fresno, Kern, Madera +4
Davis-Bacon
CA20260026 (Rev 3)
California • San Bernardino
Davis-Bacon
CA20260002 (Rev 3)
California • Imperial
Davis-Bacon
CA20260016 (Rev 3)
California • Tulare
Davis-Bacon
CA20260015 (Rev 3)
California • Ventura
Davis-Bacon
CA20260017 (Rev 3)
California • Imperial, Los Angeles, Orange +5