Skip to content
Davis-Bacon

CA20260020 (Rev 3)

Coverage: California • Inyo, Kern, Mono.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
INSULATOR/ASBESTOS WORKER: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS INYO AND KERN$56.32$26.52
FIRE STOP TECHNICIAN: APPLICATION OF FIRESTOPPING MATERIALS FOR WALL OPENINGS AND PENETRATIONS IN WALLS, FLOORS, CEILINGS AND CURTAIN WALLS (INYO AND KERN)$39.94$20.65
INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL, SCRAPPING, VACUUMING, BAGGING AND DISPOSING OF ALL INSULATION MATERIALS FROM MECHANICAL SYSTEMS, WHETHER THEY CONTAIN ASBESTOS OR NOT (INYO AND KERN)$23.52$13.37
ASBESTOS WORKERS/INSULATOR: INCLUDES THE APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS, AND FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS (MONO)$64.56$25.07
BOILERMAKER (INYO AND KERN)$51.98$42.11
BOILERMAKER (MONO COUNTY)$45.60$38.99
ABOVE THE STANDARD SAN BERNARDINO/RIVERSIDE COUNTY HOURLY WAGE RATE$45.53$20.29
TERRAZZO WORKER/SETTER$49.62$15.26
TERRAZZO FINISHER$42.11$14.67
TILE LAYER$48.29$19.18
TILE FINISHER (KERN)$37.96$13.77
MARBLE FINISHER (KERN)$43.38$15.36
RATES' COLUMN ARE PER DAY$418.96$26.18
RATES' COLUMN ARE PER DAY$442.96$26.18
RATES' COLUMN ARE PER DAY$450.96$26.18
RATES' COLUMN ARE PER DAY$901.92$26.18
DRYWALL (STOCKER/SCRAPPER)$21.45$11.27
DRYWALL (DRYWALL INSTALLER/LATHER)$52.24$26.18
PER HOUR ADDITIONAL$42.80$16.28
PER HOUR ADDITIONAL$51.03$16.28
PER HOUR ADDITIONAL$38.92$16.28
PER HOUR ADDITIONAL$51.29$16.28
CARPENTER: (05) TABLE POWER SAW OPERATOR$52.13$16.28
PER HOUR ADDITIONAL$51.17$16.28
PER HOUR ADDITIONAL$51.73$16.28
PER HOUR ADDITIONAL$52.10$16.48
MODULAR FURNITURE INSTALLER$25.00$13.06
ELECTRICIAN (CHINA LAKE NAVAL WEAPONS CENTER, EDWARDS AFB)$65.40$22.15
CABLE SPLICER (CHINA LAKE NAVAL WEAPONS CENTER, EDWARDS AFB)$71.07$22.32
CABLE SPLICER (REMAINDER OF KERN COUNTY)$62.32$22.06
SUPPLY; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, CONDUIT SYSTEMS, LINE VOLTAGE WORK, AND ENERGY MANAGEMENT SYSTEMS. FIRE ALARM WORK SHALL BE PERFORMED AT THE CURRENT INSIDE WIREMAN TOTAL COST PACKAGE$46.26$21.03
SUPPLY; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, CONDUIT SYSTEMS, LINE VOLTAGE WORK, AND ENERGY MANAGEMENT SYSTEMS. FIRE ALARM WORK SHALL BE PERFORMED AT THE CURRENT INSIDE WIREMAN TOTAL COST PACKAGE$52.39$21.21
SUPPLY; EXCLUDING INSTALLATION OF RACEWAY SYSTEMS, CONDUIT SYSTEMS, LINE VOLTAGE WORK, AND ENERGY MANAGEMENT SYSTEMS. FIRE ALARM WORK SHALL BE PERFORMED AT THE CURRENT INSIDE WIREMAN TOTAL COST PACKAGE$55.90$21.32
PER HOUR TO THE CURRENT WAGE SCALE$53.15$29.07
tes Fringes LINE CONSTRUCTION: (3) GROUNDMAN HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY$40.76$21.76
D & UNDERGROUND DISTRIBUTION LINE EQUIPMENT) HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY$53.30$22.26
INE CONSTRUCTION: (1) LINEMAN; CABLE SPLICER HOLIDAYS: NEW YEAR'S DAY, M.L. KING DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS DAY, THANKSGIVING DAY AND DAY AFTER THANKSGIVING, CHRISTMAS DAY$70.16$24.71
FOR 6 MONTHS TO 5 YEARS OF SERVICE. B. PAID HOLIDAYS: NEW YEAR'S DAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, VETERANS' DAY, THANKSGIVING DAY, FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY$69.43$38.44
OPERATOR, POWER EQUIPMENT: (6) BARGE MATE (DREDGING)$61.34$40.95
OPERATOR, POWER EQUIPMENT: (5) FIREMAN-OILER, DECKHAND, BARGEMAN, LEVEEHAND (DREDGING)$60.73$40.95
OPERATOR, POWER EQUIPMENT: (4) WINCH OPERATOR (STERN WINCH ON DREDGE) (DREDGING)$61.27$40.95
OPERATOR, POWER EQUIPMENT: (3) DECKMATE (DREDGING)$61.82$40.95
OPERATOR, POWER EQUIPMENT: (2) DREDGE DOZER (DREDGING)$61.93$40.95
OPERATOR, POWER EQUIPMENT: (1) LEVERMAN (DREDGING)$67.90$40.95
per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator$66.91$33.20
per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator$66.79$33.20
per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator$66.68$33.20
per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator$66.46$33.20
per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator$66.32$33.20
per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator$66.03$33.20
per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator$65.25$33.20
operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons)$70.75$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$69.75$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$68.75$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$67.75$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$66.75$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$66.58$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$66.41$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$66.29$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$66.18$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$65.96$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$65.82$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$65.53$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$64.75$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$67.91$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$67.79$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$67.68$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$67.58$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$67.41$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$67.29$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$67.18$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$67.08$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$66.71$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$64.67$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$64.18$33.20
PER HOUR ADDITIONAL. COMBINATION MIXER AND COMPRESSOR OPERATOR ON GUNITE WORK SHALL BE CLASSIFIED AS A CONCRETE MOBILE MIXER OPERATOR$63.40$33.20
IRONWORKER (INYO AND MONO COUNTIES)$43.75$34.45
IRONWORKER (KERN COUNTY)$50.70$35.15
LABORER, TUNNEL: GROUP 4 GROUP 4: DIAMOND DRILLER; SANDBLASTER; SHAFT AND RAISE WORK (KERN COUNTY)$55.07$25.74
MACHINES; POWDER PERSON (PRIMER HOUSE); PRIMER PERSON; SANDBLASTER; SHOTCRETE PERSON; STEEL FORM RAISER AND SETTER; TIMBER PERSON, RETIMBER PERSON, WOOD OR STEEL; TUNNEL CONCRETE FINISHER (KERN COUNTY)$54.38$25.74
LETENDER; LOADING AND UNLOADING AGITATOR CARS; VIBRATOR PERSON, JACK HAMMER, PNEUMATIC TOOLS (EXCEPT DRILLER); BULL GANG MUCKER, TRACK PERSON; CONCRETE CREW, INCLUDING RODDER AND SPREADER (KERN COUNTY)$53.92$25.74
ERSON AND SWITCH PERSON ON TUNNEL WORK); TUNNEL MATERIALS HANDLING PERSON; NIPPER; POT TENDER, USING MASTIC OR OTHER MATERIALS (FOR EXAMPLE, BUT NOT BY WAY OF LIMITATION, SHOTCRETE, ETC.) (KERN COUNTY)$53.60$25.74
EXCLUDING JACKHAMMER, WHETHER CORE, DIAMOND, WAGON, TRACK, MULTIPLE UNIT, AND ANY AND ALL OTHER TYPES OF MECHANICAL DRILLS WITHOUT REGARD TO THE FORM OF MOTIVE POWER; TOXIC WASTE REMOVAL (KERN COUNTY)$49.48$25.95
MATERIAL FROM WHICH THE TUBULAR MATERIAL IS FABRICATED; NO-JOINT PIPE AND STRIPPING OF SAME; PREFABRICATED MANHOLE INSTALLER; SANDBLASTER (NOZZLE PERSON), WATER BLASTING, PORTA SHOT-BLAST (KERN COUNTY)$49.13$25.95
K SLINGER; ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; STEEL HEADERBOARD AND GUIDELINE SETTER; TAMPER, BARKO, WACKER AND SIMILAR TYPE; TRENCHING MACHINE, HAND-PROPELLED (KERN COUNTY)$47.58$25.95
AND INSTALLER(LEAD); TANK SCALER AND CLEANER; TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDER; UNDERGROUND LABORER, INCLUDING CAISSON BELLOWER (KERN COUNTY)$47.03$25.95
ND SIGNALING; SCALER; SLIP FORM RAISER; TAR AND MORTAR; TOOL CRIB OR TOOL HOUSE LABORER; TRAFFIC CONTROL BY ANY METHOD; WINDOW CLEANER; WIRE MESH PULLING - ALL CONCRETE POURING OPERATIONS (KERN COUNTY)$46.48$25.95
BRICK TENDER (KERN COUNTY)$42.60$22.13
URE AND DISPOSAL OF ASBESTOS- CONTAINING MATERIALS AND TOXIC WASTE BY HAND OR WITH EQUIPMENT OR MACHINERY; SCAFFOLDING, FABRICATION OF TEMPORARY WOODEN BARRIERS AND ASSEMBLY OF DECONTAMINATION STATIONS$46.48$25.93
LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE$51.39$23.77
LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE$54.93$23.77
LEVEL SHALL BE COMPENSATED FOR AT 35 CENTS PER HOUR ABOVE THE APPLICABLE CLASSIFICATION WAGE RATE$55.88$23.77
LABORER, TUNNEL: GROUP 4: DIAMOND DRILLER; SANDBLASTER; SHAFT AND RAISE WORK (INYO AND MONO COUNTIES)$55.07$25.74
OWDER PERSON (PRIMER HOUSE); PRIMER PERSON; SANDBLASTER; SHOTCRETE PERSON; STEEL FORM RAISER AND SETTER; TIMBER PERSON, RETIMBER PERSON, WOOD OR STEEL; TUNNEL CONCRETE FINISHER (INYO AND MONO COUNTIES)$54.38$25.74
OADING AND UNLOADING AGITATOR CARS; VIBRATOR PERSON, JACK HAMMER, PNEUMATIC TOOLS (EXCEPT DRILLER); BULL GANG MUCKER, TRACK PERSON; CONCRETE CREW, INCLUDING RODDER AND SPREADER (INYO AND MONO COUNTIES)$53.92$25.74
ITCH PERSON ON TUNNEL WORK); TUNNEL MATERIALS HANDLING PERSON; NIPPER; POT TENDER, USING MASTIC OR OTHER MATERIALS (FOR EXAMPLE, BUT NOT BY WAY OF LIMITATION, SHOTCRETE, ETC.) (INYO AND MONO COUNTIES)$53.60$25.74
JACKHAMMER, WHETHER CORE, DIAMOND, WAGON, TRACK, MULTIPLE UNIT, AND ANY AND ALL OTHER TYPES OF MECHANICAL DRILLS WITHOUT REGARD TO THE FORM OF MOTIVE POWER; TOXIC WASTE REMOVAL (INYO AND MONO COUNTIES)$49.48$25.95
OM WHICH THE TUBULAR MATERIAL IS FABRICATED; NO-JOINT PIPE AND STRIPPING OF SAME; PREFABRICATED MANHOLE INSTALLER; SANDBLASTER (NOZZLE PERSON), WATER BLASTING, PORTA SHOT-BLAST (INYO AND MONO COUNTIES)$49.13$25.95
ROTARY SCARIFIER OR MULTIPLE HEAD CONCRETE CHIPPING SCARIFIER; STEEL HEADERBOARD AND GUIDELINE SETTER; TAMPER, BARKO, WACKER AND SIMILAR TYPE; TRENCHING MACHINE, HAND-PROPELLED (INYO AND MONO COUNTIES)$47.58$25.95
ER(LEAD); TANK SCALER AND CLEANER; TREE CLIMBER, FALLER, CHAIN SAW OPERATOR, PITTSBURGH CHIPPER AND SIMILAR TYPE BRUSH SHREDDER; UNDERGROUND LABORER, INCLUDING CAISSON BELLOWER (INYO AND MONO COUNTIES)$47.03$25.95
G; SCALER; SLIP FORM RAISER; TAR AND MORTAR; TOOL CRIB OR TOOL HOUSE LABORER; TRAFFIC CONTROL BY ANY METHOD; WINDOW CLEANER; WIRE MESH PULLING - ALL CONCRETE POURING OPERATIONS (INYO AND MONO COUNTIES)$46.48$25.95
BRICK TENDER (INYO AND MONO COUNTIES)$42.60$22.13
OUP 4 STRIPER: LAYOUT AND APPLICATION OF TRAFFIC STRIPES AND MARKINGS; HOT THERMO PLASTIC; TAPE TRAFFIC STRIPES AND MARKINGS, INCLUDING TRAFFIC CONTROL; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT$54.35$23.97
MANENTLY AFFIXED ROADSIDE AND PARKING DELINEATION BARRICADES, FENCING, CABLE ANCHOR, GUARD RAIL, REFERENCE SIGNS, MONUMENT MARKERS; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT; POWER BROOM SWEEPER$52.61$23.97
AND PREPARATION OF SURFACE FOR COATINGS. TRAFFIC CONTROL PERSON: CONTROLLING AND DIRECTING TRAFFIC THROUGH BOTH CONVENTIONAL AND MOVING LANE CLOSURES; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT$50.60$23.97
INCLUDING REPAIR AND FILLING OF CRACKS BY ANY METHOD ON ANY SURFACE IN PARKING LOTS, GAME COURTS AND PLAYGROUNDS; CARSTOPS; OPERATION OF ALL RELATED MACHINERY AND EQUIPMENT; EQUIPMENT REPAIR TECHNICIAN$49.30$23.97
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (4) ELECTRONIC TRACKING LOCATOR$51.96$20.86
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (3) HORIZONTAL DIRECTIONAL DRILL OPERATOR$49.96$20.86
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (2) VEHICLE OPERATOR/HAULER$48.11$20.86
LABORERS: HORIZONTAL DIRECTIONAL DRILLING: (1) DRILLING CREW LABORER$47.94$20.86
DRYWALL FINISHER/TAPER$45.20$26.82
PAINTERS: INCLUDING LEAD ABATEMENT: (5) INDUSTRIAL$41.42$19.04
PAINTERS: INCLUDING LEAD ABATEMENT: (4) ALL OTHER WORK$34.08$18.50
PAINTERS: INCLUDING LEAD ABATEMENT: (1) JOURNEYMAN PAINTER$34.08$18.50
GLAZIER$44.33$28.88
SOFT FLOOR LAYER$45.15$19.43
ADDITIONAL PER HOUR$47.37$19.64
CEMENT MASON/CONCRETE FINISHER$47.70$27.07
PLUMBER (SEWER & STORM DRAIN WORK)$48.84$23.58
PLUMBER (LANDSCAPE/IRRIGATION FITTER)$44.75$26.20
ABOVE THE REGULAR RATE OF PAY FOR THAT DAY$68.73$26.81
ABOVE THE REGULAR RATE OF PAY FOR THAT DAY$72.23$26.81
ABOVE THE REGULAR RATE OF PAY FOR THAT DAY$61.73$26.81
PER HOUR ADDITIONAL$45.76$16.86
SPRINKLER FITTER$50.79$29.80
EL WORK (LOS ANGELES (SOUTH OF A STRAIGHT LINE DRAWN BETWEEN GORMAN AND BIG PINES)AND CATALINA ISLAND, INYO, KERN (NORTHEAST PART, EAST OF HWY 395), MONO ORANGE, RIVERSIDE, AND SAN BERNARDINO COUNTIES)$59.31$30.43
tes Fringes SHEET METAL WORKER (KERN (EXCLUDING PORTION EAST OF HWY 395) & LOS ANGELES (NORTH OF A STRAIGHT LINE DRAWN BETWEEN GORMAN AND BIG PINES INCLUDING CITIES OF LANCASTER AND PALMDALE) COUNTIES)$45.98$29.24
TRUCK DRIVER GROUP 7$42.37$35.69