Davis-Bacon
AZ20260034 (Rev 1)
Coverage: Arizona • Santa Cruz.
Published: May 18, 2026
Status: Active
Standard: Yes
Occupation Rates
Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.
| Occupation | Base | Fringe |
|---|---|---|
| POWER EQUIPMENT OPERATOR: (DRILL RIG/AUGER) | $35.56 | $18.12 |
| IRONWORKER | $39.50 | $19.91 |
| LABORER: ASPHALT, INCLUDES RAKER, SHOVELER, SPREADER AND DISTRIBUTOR | $29.91 | $9.26 |
| LABORER: MASON TENDER | $29.91 | $9.26 |
| LABORER: PIPELAYER | $31.98 | $9.26 |
| TRUCK DRIVER: WATER | $28.90 | $4.18 |
| TRUCK DRIVER: DUMP | $24.50 | $2.20 |
| TRAFFIC CONTROL | $19.38 | $2.54 |
| POWER EQUIPMENT OPERATOR: PAVER/SPREADER/FINISH EQUIPMENT (ASPHALT, AGGREGATE, & CONCRETE) | $31.55 | $0.06 |
| POWER EQUIPMENT OPERATOR: OILER | $31.86 | $10.01 |
| POWER EQUIPMENT OPERATOR: MOTOR GRADER/BLADE | $36.47 | $3.61 |
| POWER EQUIPMENT OPERATOR: LOADER/FRONT END LOADER | $26.07 | $3.80 |
| POWER EQUIPMENT OPERATOR: FORKLIFT | $38.31 | $9.20 |
| POWER EQUIPMENT OPERATOR: EXCAVATOR/TRACKHOE | $39.48 | $0.00 |
| POWER EQUIPMENT OPERATOR: CRANE / DERRICKS | $44.33 | $13.07 |
| POWER EQUIPMENT OPERATOR: CONCRETE SCREED | $33.90 | $0.00 |
| POWER EQUIPMENT OPERATOR: COMPACTOR/ROLLER | $26.76 | $4.76 |
| POWER EQUIPMENT OPERATOR: BOBCAT/SKID STEER/SKID LOADER | $32.53 | $0.00 |
| PAINTER: SIGN AND DISPLAY ERECTOR | $19.06 | $2.99 |
| LABORER: GENERAL | $23.96 | $2.15 |
| CARPENTER: FORMWORK CONCRETE | $32.51 | $10.13 |