Skip to content
Davis-Bacon

AK20260001 (Rev 1)

Coverage: Alaska • Aleutians East, Aleutians West, Anchorage +20.

Published: May 18, 2026
Status: Active
Standard: Yes

Occupation Rates

Parsed from SAM WD content. Always validate final applicability and source text before pricing decisions.

OccupationBaseFringe
TERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUMING, BAGGING, AND DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS)$37.38$19.55
ASBESTOS WORKERS/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS PROTECTIVE COVERINGS, COATINGS AND FINISHINGS TO ALL TYPES OF MECHANICAL SYSTEMS)$41.35$16.46
BOILERMAKER$58.33$28.79
TILE & TERRAZZO FINISHER$40.91$12.48
BRICKLAYER, BLOCKLAYER, STONEMASON, MARBLE MASON, TILE SETTER, TERRAZZO WORKER$52.77$12.36
CARPENTER (INCLUDING LATHER AND DRYWALL HANGING)$50.79$26.42
MILLWRIGHT$56.44$25.87
PILEDRIVER (WELDER)$54.28$26.42
PILEDRIVER (SHEET STABBER)$48.72$26.42
F CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT$92.83$26.42
F CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT$53.03$25.34
F CLASSIFICATIONS: EMPLOYEES WORKING IN ANY COMBINATION OF CLASSIFICATIONS WITHIN THE DIVING CREW (EXCEPT DIVE SUPERVISOR) IN A SHIFT ARE PAID IN THE CLASSIFICATION WITH THE HIGHEST RATE FOR THAT SHIFT$61.42$25.34
ELECTRICIAN$55.44$30.33
CABLE SPLICER$55.44$30.33
TREE TRIMMER, LINE CONSTRUCTION$42.23$30.10
POWDERMAN, LINE CONSTRUCTION$70.59$35.59
LINEMEN: LINE CONSTRUCTION (INCLUDING EQUIPMENT OPERATORS, TECHNICIAN)$72.59$35.65
CABLE SPLICER (LINE CONSTRUCTION)$74.34$35.70
ARS' OF SERVICE AS VACATION PAID CREDIT. B. EIGHT PAID HOLIDAYS: NEW YEAR'S DAY; MEMORIAL DAY; INDEPENDENCE DAY; LABOR DAY; VETERAN'S DAY; THANKSGIVING DAY; FRIDAY AFTER THANKSGIVING, AND CHRISTMAS DAY$71.44$38.44
PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM$58.55$29.50
PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM$48.47$29.50
PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM$56.60$29.50
PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM$57.55$29.50
R PLANTS: 1000 K.W. AND OVER; QUAD; SCREED; SHOVELS, BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS (OVER 3 YARDS), SIDEBOOMS OVER 45 TONS; SLIP FORM PAVER, C.M.I. AND SIMILAR TYPES; SCRAPERS OVER 40 YARDS;$60.86$29.50
PREMIUM WHILE PERFORMING TUNNEL OR UNDERGROUND WORK. RIG OILER/CRANE ASSISTANT ENGINEER SHALL BE REQUIRED ON CRANES OVER 85 TONS OR OVER 100 FEET OF BOOM$44.06$29.50
POT FIREMAN (POWER AGITATED); POWER PLANT, TURBINE OPERATOR, UNDER 200 K.W.; PUMPS-WATER; ROLLER-OTHER THAN PLANTMIX; SAWS, CONCRETE; SKID STEER WITH ALL ATTACHMENTS; STRAIGHTENING MACHINE; TOW TRACTOR$51.46$29.50
OCOMOTIVES: ROD AND GEARED ENGINES; MIXERS; SCREENING, WASHING PLANT; SIDEBOOM (CRADLING ROCK DRILL REGARDLESS OF SIZE); SKIDDER; TRENCING MACHINE UNDER 16 INCHES; WASTE/ WASTE WATER TREATMENT OPERATOR$52.32$29.50
R PLANTS: 1000 K.W. AND OVER; QUAD; SCREED; SHOVELS, BACKHOES, EXCAVATORS WITH ALL ATTACHMENTS (OVER 3 YARDS), SIDEBOOMS OVER 45 TONS; SLIP FORM PAVER, C.M.I. AND SIMILAR TYPES; SCRAPERS OVER 40 YARDS;$55.33$29.50
DARAPIDS, BARBER GREENE, SLURRY MACHINE; SUB-GRADER (GURRIES, RECLAIMER, AND SIMILAR TYPES); TACK TRACTOR; TRUCK MOUNTED CONCRETE PUMPS, CONVEYOR, CRETER; WATER KOTE MACHINE; UNLICENSED OFF ROAD HAULER$53.23$29.50
IRONWORKER (HELICOPTER, TOWER)$47.89$39.48
IRONWORKER (GUARDRAIL LAYOUT MAN)$44.22$39.48
IRONWORKER (GUARDRAIL INSTALLERS)$44.48$39.48
IRONWORKER (FENCE, BARRIER INSTALLER)$43.48$39.48
IRONWORKER (BRIDGE, STRUCTURAL, ORNAMENTAL, REINFORCING MACHINERY MOVER, RIGGER, SHEETER, STAGE RIGGER, BENDER OPERATOR)$46.98$39.48
IRONWORKER (BENDER OPERATOR)$46.98$39.48
LABORER: TUNNELS, SHAFTS, AND RAISES GROUP 3B (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE)$59.41$28.81
RILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS$51.18$34.26
P 3 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN$46.37$34.26
ER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN$45.38$34.26
SLURRY WORK; STAKE HOPPER; STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER$44.28$34.26
LABORER: GROUP 4 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) FINAL BUILDING CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS$29.82$34.26
LABORER: GROUP 3B (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE)$54.01$28.81
RILL DOCTOR (IN THE FIELD); DRILLERS (INCLUDING, BUT NOT LIMITED TO, WAGON DRILLS, AIR TRACK DRILLS; HYDRAULIC DRILLS); POWDERMAN; PIONEER DRILLING AND DRILLING OFF TUGGER (ALL TYPE DRILLS); PIPELAYERS$46.53$34.26
P 3 (SOUTH OF THE 63RD PARALLEL & WEST OF LONGITUDE 138 DEGREES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN$42.15$34.26
ER TENDERS; POWER SAW OPERATOR; RAILROAD SWITCH LAYOUT LABORER; SANDBLASTER; SEWER CAULKERS; SEWER PLANT MAINTENANCE MAN; THERMAL PLASTIC APPLICATOR; TIMBER FALLER, CHAIN SAW OPERATOR, FILER; TIMBERMAN$41.25$34.26
SLURRY WORK; STAKE HOPPER; STEAM POINT OR WATER JET OPERATOR; STEAM CLEANER OPERATOR; TANK CLEANING; UTILIWALK, UTILIDOR LABORER AND CONDUIT INSTALLER; WATCHMAN (CONSTRUCTION PROJECTS); WINDOW CLEANER$40.25$34.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES; GROUP 3B (TUNNELS, SHAFTS, AND RAISES) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE)$59.41$28.81
OF LONGITUDE 138 DEGREES: GROUP 3 (TUNNELS, SHAFTS, AND RAISES) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN$46.37$34.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 4) FINAL BUILDING CLEANUP TUNNELS, SHAFTS, AND RAISES CLASSIFICATIONS$29.82$34.26
LABORERS: NORTH OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3B) GRADE CHECKER (SETTING OR TRANSFERING OF GRADE MARKS, LINE AND GRADE)$54.01$28.81
H OF THE 63RD PARALLEL & EAST OF LONGITUDE 138 DEGREES (GROUP 3) ALARM INSTALLER; BIT GRINDER; GUARDRAIL MACHINE OPERATOR; HIGH RIGGER AND TREE TOPPER; HIGH SCALER; MULTIPLATE; SLURRY SEAL SQUEEGEE MAN$42.15$34.26
NG, TEXTURING, STRUCTURAL PAINTING, SANDBLASTING, POT TENDER, FINISH METAL, SPRAY, BUFFER OPERATOR, RADON MITIGATION, LEAD BASED PAINT ABATEMENT, HAZARDOUS MATERIAL HANDLER (NORTH OF THE 63RD PARALLEL)$43.57$26.45
PAINTER: BRUSH/ROLLER PAINT OR WALL COVERER (NORTH OF THE 63RD PARALLEL)$43.05$26.45
PAINTER: TAPER / PAPER & VINYL HANGER (SOUTH OF THE 63RD PARALLEL)$38.54$30.20
PAINTER: INDUSTRIAL PAINTER (SOUTH OF THE 63RD PARALLEL)$38.64$30.20
PAINTER: GENERAL PAINTER (SOUTH OF THE 63RD PARALLEL)$37.29$30.20
GLAZIER (NORTH OF THE 63RD PARALLEL)$46.76$30.46
FLOOR LAYER: CARPET$39.48$16.25
GLAZIER (SOUTH OF THE 63RD PARALLEL)$47.42$29.10
PLASTERER (SOUTH OF THE 63RD PARALLEL)$49.28$22.28
PLASTERER (NORTH OF THE 63RD PARALLEL)$49.28$22.28
CEMENT MASON/CONCRETE FINISHER (SOUTH OF THE 63RD PARALLEL)$49.28$22.28
CEMENT MASON/CONCRETE FINISHER (NORTH OF THE 63RD PARALLEL)$49.28$22.28
SPRINKLER FITTER$60.67$31.39
ROOFER$52.07$19.62
SHEET METAL WORKER (SOUTH OF THE 63RD PARALLEL)$52.08$30.81
SHEET METAL WORKER (NORTH OF THE 63RD PARALLEL)$58.73$29.54
TEAM DRIVERS (HORSES, MULES AND SIMILAR EQUIPMENT); FUEL HANDLER (STATION/BULK ATTENDANT); BATCH TRUCK, UP TO AND INCLUDING 7 YARDS; GEAR/SUPPLY TRUCK; BUS OPERATOR, UP TO 30 PASSENGERS; RIGGER/SWAMPER$47.62$26.43
LAR TYPE VEHICLE; FIRE TRUCK/AMBULANCE DRIVER; COMBINATION TRUCK-FUEL AND GREASE; COMPACTOR (WHEN PULLED BY RUBBER TIRED EQUIPMENT); RIGGER (AIR/WATER/OILFIELD); READY MIX, UP TO AND INCLUDING 7 YARDS;$48.50$26.43
AND TRUCKS WITH PUPS) OVER 10 YARDS UP TO AND INCLUDING 20 YARDS; BATCH TRUCKS 8 YARDS AND UP; OIL DISTRIBUTOR DRIVERS; OIL DISTRIBUTOR DRIVERS; TRUCKS/JEEPS (PUSH OR PULL); TRAFFIC CONTROL TECHNICIAN$49.17$26.43
OWBOYS INCLUDING ATTACHED TRAILERS AND JEEPS UP TO AND INCLUDING 8 AXLES; SUPER VAC TRUCK/CACASCO TRUCK/HEAT STRESS TRUCK; READY-MIX OVER 7 YARDS UP TO AND INCLUDING 12 YARDS; PARTSMAN; STRINGING TRUCK$50.12$26.43
TRUCK DRIVER (GROUP 1A) DUMP TRUCKS (INCLUDING ROCKBUGGY AND TRUCKS WITH PUPS) OVER 60 YARDS UP TO AND INCLUDING 100 YARDS; JEEPS (DRIVER UNDER LOAD)$53.05$26.43
OXSWAIN; LOWBOYS INCLUDING ATTACHED TRAILERS AND JEEPS, UP TO AND INCLUDING 12 AXLES; READY-MIX OVER 12 YARDS UP TO AND INCLUDING 15 YARDS); WATER WAGON (250 BBLS AND ABOVE); TIREMAN, HEAVY DUTY/FUELER$51.58$26.43