Ackerman Rd, 660 - Chiller Replacement
Federal opportunity from The Ohio State University. Place of performance: OH.
- Source
- Open on official portal →
- Solicitation
- OSU-265050
- Performance
- Columbus, OH
- Response
- No due date posted
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 35 more rate previews.↓
Description
Ackerman Rd, 660 - Chiller Replacement
Solicitation Number: OSU-265050
Type: General Contract
Plans: bidexpress.com
Pre-Bid Information: Date: Wednesday, May 27, 10:00 am
Location:
660 Ackerman Rd - Columbus, OH 43202
Bid Information: Date: Tuesday, June 9, 2:00 pm
bidexpress.com
Source page: https://fod.osu.edu/bids
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Ohio State University is soliciting bids for the chiller replacement project at Ackerman Rd, 660, with solicitation number OSU-265050. A pre-bid meeting is scheduled for May 27, 2023, at 10:00 AM, and bids are due on June 9, 2023, at 2:00 PM. This is a general contracting opportunity, and interested bidders can access plans via bidexpress.com.
The buyer is looking to replace the existing chiller system at Ackerman Rd, 660, to improve efficiency and reliability in HVAC performance.
- General Contractors with HVAC experience
- Companies with past performance on similar chiller replacement projects
- Contractors based in Ohio or those familiar with local regulations
- Site Assessment and Preparation
- Chiller System Specification and Sourcing
- Installation of New Chiller System
- Testing and Commissioning of New System
- Completed Bid Form
- Proof of Licenses and Certifications
- References from Previous Projects
- Insurance Documentation
- Schedule and Timeline
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Ensure all work meets Ohio state regulations
- Adhere to safety standards during installation
- Consider competitive pricing while ensuring margins are maintained
- Account for potential contingencies in project execution
- HVAC specialists for hands-on installation
- Electrical contractors for any wiring alterations required
- Local suppliers for sourcing chiller system components
- Potential delays in chiller delivery impacting installation timeline
- Weather conditions affecting outdoor work schedule
- Compliance with university regulations and safety standards
- What specific chiller models are being considered?
- Are there any existing issues with the current HVAC system that need addressing during the replacement?
- Is there an expected timeline for project completion?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Confirmed dates for pre-bid and bid submission
- Specific requirements for the chiller system
- Budget range for the project
- Details on existing system issues
- Site access and logistical considerations
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.