Skip to content
Department of Transportation

613383 LYNNFIELD-WAKEFIELD FAP No. NHP(IM)-0954(007)X Interstate Pavement Preservation and Related

Solicitation: BD-26-1030-0H100-0H002-125979
Notice ID: ma_commbuys_a9bc820e51bd05134776
DepartmentDepartment of TransportationStateMAPostedDueMay 27, 2026, 02:00 PM UTCCloses in 3 daysBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from Department of Transportation. Place of performance: MA. Response deadline: May 27, 2026.

Source
Open on official portal →
Solicitation
BD-26-1030-0H100-0H002-125979
Performance
MA
Response
May 27, 2026, 02:00 PM UTC
Open on official portal →
Live POP
Place of performance
MA
Contracting office
Not listed

Point of Contact

Name
Alex Deng
Email
Not available
Phone
Not available

Agency & Office

Department
Department of Transportation
Agency
Not available
Subagency
Not available
Office
Alex Deng
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260001 (Rev 1)
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
90 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 88 more rate previews.
Davis-BaconBest fitstate match
MA20260001 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
TOR/ASBESTOS WORKER (ZONE B) ZONE B- BARNSTABLE COUNTY (BARNSTABLE, BOURNE, FALMOUTH, MASHPEE, SANDWICH), BRISTOL COUNTY (ALL CITIES EXCEPT EASTON),AND NORFOLK COUNTY (BELLINGHAM, FRANKLIN, PLAINVILLE)
Base $55.45Fringe $36.63
Rate
OOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBOROUGH, HOLBROOK, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWOOD, QUINCY, RANDOLPH, SHARON, STOUGHTON, WALPOLE, WELLESLEY, WESTWOOD, WEYMOUTH)
Base $55.45Fringe $36.63
Rate
URO, WELLFLEET AND YARMOUTH); BRISTOL (EASTON); ESSEX; MIDDLESEX; NORFOLK (AVON, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, HOLBROOK, HULL, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHA
Base $55.45Fringe $36.63
+87 more occupation rates in this WD
Davis-Baconstate match
MA20260014 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Dukes, Nantucket
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
s POWER EQUIPMENT OPERATOR: (4) ROLLER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $39.12Fringe $31.04
Rate
POWER EQUIPMENT OPERATOR: (1) LOADER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $42.88Fringe $31.04
+6 more occupation rates in this WD
Davis-Baconstate match
MA20260009 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Dukes, Nantucket
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
TERRAZZO FINISHER
Base $63.44Fringe $37.33
Rate
MARBLE, TILE & TERRAZZO WORKERS
Base $64.52Fringe $37.51
+40 more occupation rates in this WD
Davis-Baconstate match
MA20260024 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Suffolk
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+23 more occupation rates in this WD

Description

Do Not Use COMMBUYS to Bid on this Project

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,508,452,282
Sector total $3,508,452,282 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,556$3,256,200
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,508,452,282)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

No public attachments surfaced yet. Some owner portals gate files behind registration, and BidPulsar keeps enriching the package as new public links appear.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Mar 14, 2026
Client-ready brief
Executive summary
medium confidencegpt 5.2

This notice is for “613383 LYNNFIELD-WAKEFIELD FAP No. NHP(IM)-0954(007)X Interstate Pavement Preservation and Related” under the 0H100 – HIGHWAY agency. The response deadline shown is 2026-05-05 14:00 UTC. A critical instruction in the description states: “Do Not Use COMMBUYS to Bid on this Project,” which directly affects submission method and compliance. The primary next step is to open and analyze the attached bid document to confirm the correct bid portal/process, scope, and mandatory forms before deciding to pursue.

613383LYNNFIELD-WAKEFIELDFAP No. NHP(IM)-0954(007)XInterstate Pavement Preservation0H100 - HIGHWAYSBPP EligibleDo Not Use COMMBUYS
What the buyer is trying to do

Procure an interstate pavement preservation project with related work in the Lynnfield–Wakefield area (FAP No. NHP(IM)-0954(007)X), via a submission process explicitly not using COMMBUYS.

Who should pursue this
  • Highway/heavy civil contractors with demonstrated interstate pavement preservation experience
  • Firms eligible for SBPP (notice indicates “SBPP Eligible: YES”)
Work breakdown
  • Interstate pavement preservation (as titled)
  • Related work items included in the contract (details must be confirmed in the attachment)
  • Bid submission via a non-COMMBUYS method (confirm exact channel and steps in the attachment)
Response package checklist
  • Download and review the attached bid document (attachment_urls) to identify the official bid instructions and required forms
  • Confirm the correct submission platform/method since COMMBUYS is explicitly prohibited for bidding
  • Confirm all bid forms, affidavits, and signatures required by the bid document
  • Confirm bid security/bond requirements (if any) in the attachment
  • Confirm scope, pay items, quantities, and any phasing/traffic control requirements in the attachment
  • Confirm required schedule milestones and period of performance details in the attachment
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Submission instruction risk: the description explicitly says “Do Not Use COMMBUYS to Bid on this Project”; follow the alternate submission method stated in the attached solicitation documents.
  • SBPP note: “SBPP Eligible: YES” is indicated; confirm any eligibility documentation requirements in the attachment.
Pricing strategy
  • Use the bid document pay items/quantities (in the attachment) to build unit pricing specifically for interstate pavement preservation and any listed related items.
  • Include cost impacts tied to the non-COMMBUYS submission process (e.g., delivery method/format) only as required by the solicitation instructions in the attachment.
Teaming and subs
  • Line up typical heavy-civil subs aligned to interstate pavement preservation and related items (confirm exact trade needs from the attachment before finalizing subs).
Risks and watchouts
  • Bid submission noncompliance: submitting through COMMBUYS could lead to rejection due to the explicit instruction not to use COMMBUYS.
  • Scope ambiguity risk: the notice text does not include detailed work items; relying on the attachment is mandatory to avoid missed requirements.
  • NAICS/industry coding inconsistency: listed NAICS values appear unusual for highway work; do not rely on them for interpreting scope—use the attachment.
Smart questions to ask
  • What is the exact bid submission method/location (portal, email, physical delivery) since COMMBUYS must not be used?
  • Are there any mandatory pre-bid meetings/site visits listed in the attached bid document?
  • What are the required bid security, performance/payment bond requirements, and thresholds (if any) per the attachment?
  • What are the key traffic management/phasing constraints for the Lynnfield–Wakefield interstate limits (as defined in the attachment)?
  • What are the required completion milestones and any interim dates tied to the period of performance in the attachment?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Full solicitation/bid document contents (scope details, pay items, specifications, submission instructions) are only available via the attachment and are not provided in the brief.
  • Solicitation number is not provided in the brief.
  • Place of performance and exact project limits are not provided in the brief.
  • Posted date is not provided in the brief.
  • Period of performance start/end dates are not provided in the brief.
  • Required bid forms, bonding/insurance requirements, and evaluation/award basis are not provided in the brief.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1030-0H100-0H002-125979
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.