Skip to content
Executive Office of Energy and Environmental Affairs

Ticket 377349 - FY26 - DCR Fleet EV Charging Stations Tolland State Forest Office

Solicitation: BD-26-1042-ENVOP-FAC01-128328
Notice ID: ma_commbuys_36a74392d533c791cc3d
Contract snapshot

Federal opportunity from ENVOPS - Operations • Executive Office of Energy and Environmental Affairs. Place of performance: MA. Response deadline: May 11, 2026. Industry: Source industry codes 25, 17, 50.

Source
Open on official portal →
Solicitation
BD-26-1042-ENVOP-FAC01-128328
Performance
th Floor Boston, MA 02114
Response
May 11, 2026, 03:00 PM UTC
Open on official portal →
Map for MA
Live POP
Place of performance
th Floor Boston, MA 02114
State: MA
Contracting office
Leila Archi 100 Cambridge Street 10th Floor Boston, MA 02114 US

Point of Contact

Name
Not available
Email
Not available
Phone
(617) 626-1000

Agency & Office

Department
Executive Office of Energy and Environmental Affairs
Agency
ENVOPS - Operations
Subagency
ENVOPS - Operations
Office
FAC01 - Facilities
Contracting Office Address
Leila Archi 100 Cambridge Street 10th Floor Boston, MA 02114 US

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
MA20260001 (Rev 1)
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
90 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 88 more rate previews.
Davis-BaconBest fitstate match
MA20260001 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Barnstable, Bristol, Dukes +5
Rate
TOR/ASBESTOS WORKER (ZONE B) ZONE B- BARNSTABLE COUNTY (BARNSTABLE, BOURNE, FALMOUTH, MASHPEE, SANDWICH), BRISTOL COUNTY (ALL CITIES EXCEPT EASTON),AND NORFOLK COUNTY (BELLINGHAM, FRANKLIN, PLAINVILLE)
Base $55.45Fringe $36.63
Rate
OOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBOROUGH, HOLBROOK, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHAM, NORFOLK, NORWOOD, QUINCY, RANDOLPH, SHARON, STOUGHTON, WALPOLE, WELLESLEY, WESTWOOD, WEYMOUTH)
Base $55.45Fringe $36.63
Rate
URO, WELLFLEET AND YARMOUTH); BRISTOL (EASTON); ESSEX; MIDDLESEX; NORFOLK (AVON, BRAINTREE, BROOKLINE, CANTON, COHASSET, DEDHAM, DOVER, FOXBORO, HOLBROOK, HULL, MEDFIELD, MEDWAY, MILLIS, MILTON, NEEDHA
Base $55.45Fringe $36.63
+87 more occupation rates in this WD
Davis-Baconstate match
MA20260014 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Dukes, Nantucket
Rate
CARPENTER
Base $43.33Fringe $27.82
Rate
s POWER EQUIPMENT OPERATOR: (4) ROLLER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $39.12Fringe $31.04
Rate
POWER EQUIPMENT OPERATOR: (1) LOADER A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, MEMORIAL DAY, INDEPENDENCE DAY, LABOR DAY, COLUMBUS DAY, VETERANS DAY, THANKSGIVING DAY AND CHRISTMAS DAY
Base $42.88Fringe $31.04
+6 more occupation rates in this WD
Davis-Baconstate match
MA20260009 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Dukes, Nantucket
Rate
BOILERMAKER
Base $50.62Fringe $28.82
Rate
TERRAZZO FINISHER
Base $63.44Fringe $37.33
Rate
MARBLE, TILE & TERRAZZO WORKERS
Base $64.52Fringe $37.51
+40 more occupation rates in this WD
Davis-Baconstate match
MA20260024 (Rev 1)
Open WD
Published May 18, 2026Massachusetts • Suffolk
Rate
ELECTRICIAN (INCLUDES TRAFFIC SIGNALIZATION)
Base $66.17Fringe $37.08
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.18Fringe $33.70
Rate
OWER EQUIPMENT OPERATORS: A. PAID HOLIDAYS: NEW YEAR'S DAY, WASHINGTON'S BIRTHDAY, LABOR DAY, MEMORIAL DAY, INDEPENDENCE DAY, PATRIOT'S DAY, COLUMBUS DAY, VETERAN'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
Base $57.83Fringe $33.70
+23 more occupation rates in this WD

Description

Ticket 377349 - FY26 - DCR Fleet EV Charging Stations Tolland State Forest Office

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,508,452,282
Sector total $3,508,452,282 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,556$3,256,200
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,508,452,282)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Updated: Apr 19, 2026
Client-ready brief
Executive summary
medium confidencegpt 4o mini

The opportunity involves providing EV charging stations for the DCR Fleet at Tolland State Forest Office, with a submission deadline on May 11, 2026. This project is designated for Small Business Program Participation (SBPP), indicating a focus on small businesses. The work aligns with NAICS classifications 25, 17, and 50, outlining the project's scope in construction and services relevant to the environmental management sector.

EV Charging StationsInfrastructure DevelopmentDCR FleetSBPPEnvironmental Compliancesource codes 25, 17, 50
What the buyer is trying to do

The buyer aims to install Fleet EV charging stations to support the DCR's transition towards electric vehicle usage, enhancing infrastructure at Tolland State Forest Office.

Who should pursue this
  • Firms with experience in EV infrastructure installations
  • Companies with SBPP eligibility
  • Contractors familiar with environmental regulations
Work breakdown
  • Site assessment and preparation for EV charging installation
  • Procurement and installation of EV charging stations
  • Compliance with environmental and electrical codes
  • Post-installation maintenance and support
Response package checklist
  • Evidence of SBPP eligibility
  • Technical proposal outlining charging station specifications
  • Cost proposal with a breakdown of materials and labor
  • Past performance documentation on similar projects
  • Timeline for project completion
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
Compliance notes
  • Ensure all work adheres to local regulations and codes
  • Document environmental impact assessments where necessary
  • Follow specific guidelines for EV charging installations
Pricing strategy
  • Consider competitive pricing for installation services to attract the state
  • Outline potential bulk purchase discounts for charging equipment
  • Include lifecycle costs for maintenance and support
Teaming and subs
  • Partner with local electrical contractors for installation
  • Collaborate with environmental consultants for compliance responsibilities
  • Engage with suppliers specializing in EV charging technology
Risks and watchouts
  • Delays in equipment procurement may impact project timelines
  • Regulatory changes regarding environmental compliance
  • Potential cost overruns due to unforeseen site conditions
Smart questions to ask
  • What specific phases of the installation are expected to face regulatory scrutiny?
  • Are there existing infrastructures that can be leveraged during installation?
  • What are the long-term maintenance expectations for the charging stations?
Source coverage notes

Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.

  • Detailed specifications for the EV charging stations
  • Any required qualifications for bidders
  • Potential project budget or funding limits
  • Specific installation timelines or stages
  • Local inspection requirements during installation
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Notice BD-26-1042-ENVOP-FAC01-128328
Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.