Request For Qualifications No. 26-41, Subcontractor Qualifications for Turbine Generator Rehabilitat
Federal opportunity from Springfield Water and Sewer Commission. Place of performance: MA. Response deadline: Jun 04, 2026.
- Source
- Open on official portal →
- Solicitation
- BD-26-1531-SWSPD-SWSPD-126780
- Performance
- MA
- Response
- Jun 04, 2026, 02:00 PM UTC
Point of Contact
Agency & Office
Applicable wage determinations
Best public WD match for the notice location and scope.
View more WD detail3 more WD matches and 88 more rate previews.↓
Description
Request For Qualifications No. 26-41, Subcontractor Qualifications for Turbine Generator Rehabilitat
Pricing and bid posture
Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.
This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.
Market snapshot
Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).
Files
Files size/type shown when available.
BidPulsar Analysis
A practical, capture-style breakdown of fit, requirements, risks, and next steps.
The Request For Qualifications No. 26-41 seeks Statements of Qualifications (SOQs) from Subcontractors specifically for the Cobble Mountain Unit 3 Turbine Generator Rehabilitation Project. This project has an estimated construction cost allocated for various subcontracting work: Painting at $350,000, Plumbing at $75,000, and Electrical Work at $300,000. Qualified firms must hold a DCAMM Certification and submit their SOQs by April 15, 2026.
The agency is aiming to gather qualified subcontractors for specific trade work associated with the rehabilitation project of the turbine generator, ensuring that industry standards and certifications are met.
- Subcontractors with a DCAMM Certification
- Firms specialized in Painting, Plumbing, or Electrical Work
- Companies with previous experience in turbine generator projects
- Submission of Statements of Qualifications (SOQ)
- Certifications checks for subcontractors
- Evaluation of subcontractor skills and construction cost estimates
- Completed SOQ documentation
- Proof of DCAMM Certification
- List of prior project experience
- Detailed cost estimates for the proposed work
More BidPulsar strategy notesCompliance, pricing, teaming, risks, questions, and coverage notes
- Firm must possess a valid DCAMM Certification
- Technical compliance with the scope of work requested
- Firm pricing should align with the estimated construction costs provided
- Consider cost-competitive strategies within the specified budgets for each trade
- Consider partnering with certified firms in other trade areas
- Explore joint ventures with experienced SC firms
- Firms may overlook the certification requirement; ensure all bidders are compliant
- Potential cost overruns if estimates are not accurately aligned with scopes
- What is the timeline for evaluating and awarding the SOQs?
- Are there specific evaluation criteria beyond compliance that the agency will prioritize?
Some notices publish limited source detail. Confirm these points before final bid/no-bid decisions.
- Exact location of project performance is not specified
- Details on evaluation criteria for SOQs are not provided
- No information on potential additional trades or certification requirements
- Lack of clarity on project timeline and milestones
- Absence of historical data or prior bid information for benchmarking
Service match
Optional support routes matched to this notice after the core solicitation details.
Related hubs & trends
Navigate the lattice: hubs for browsing, trends for pricing signals.