Skip to content
Narragansett

Sodium Hypochlorite

Solicitation: Not available
Notice ID: 4b0011aadd9cf488ef1ca216c7473efd
DepartmentNarragansettStateRIPostedMay 24, 2026, 12:00 AM UTCDueJun 11, 2026, 03:00 PM UTCCloses in 18 daysBid range$316,256 - $374,822
Contract snapshot

Federal opportunity from Narragansett • Narragansett. Place of performance: RI. Response deadline: Jun 11, 2026.

Source
Open on official portal →
Solicitation
4b0011aadd9cf488ef1ca216c7473efd
Performance
Rhode Island
Response
Jun 11, 2026, 03:00 PM UTC
Open on official portal →
Live POP
Place of performance
Rhode Island
Contracting office
Not listed

Point of Contact

Not available

Agency & Office

Department
Narragansett
Agency
Narragansett
Subagency
Narragansett
Office
Division of Purchases
Contracting Office Address
Not available

Applicable wage determinations

Best public WD match for the notice location and scope.

Directory →
Best fitDavis-Baconstate match
RI20260001 (Rev 3)
Published May 18, 2026Rhode Island • Bristol, Kent, Newport +2
77 occupation rates available in the full WD.
View more WD detail
3 more WD matches and 75 more rate previews.
Davis-BaconBest fitstate match
RI20260001 (Rev 3)
Open WD
Published May 18, 2026Rhode Island • Bristol, Kent, Newport +2
Rate
MATERIAL HANDLER (INCLUDES PREPARATION, WETTING, STRIPPING, REMOVAL SCRAPPING, VACUUMING, BAGGING & DISPOSING OF ALL INSULATION MATERIALS, WHETHER THEY CONTAIN ASBESTOS OR NOT, FROM MECHANICAL SYSTEMS)
Base $49.91Fringe $36.63
Rate
ASBESTOS WORKER/INSULATOR (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)
Base $49.91Fringe $36.63
Rate
BOILERMAKER
Base $50.62Fringe $28.82
+74 more occupation rates in this WD
Davis-Baconstate match
RI20260003 (Rev 2)
Open WD
Published May 18, 2026Rhode Island • Newport
Rate
ROOFER
Base $47.49Fringe $31.44
Rate
SHEET METAL WORKER (HVAC DUCT WORK)
Base $24.21Fringe $4.24
Rate
POWER EQUIPMENT OPERATOR (BACKHOE & BULLDOZER)
Base $11.71Fringe $2.33
+7 more occupation rates in this WD
Davis-Baconstate match
RI20260005 (Rev 2)
Open WD
Published May 18, 2026Rhode Island • Bristol, Kent, Newport +2
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $30.86Fringe $14.15
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $37.15Fringe $14.57
Rate
OF THE STRAIGHT TIME RATE, MULTIPLIED BY THE TOTAL HOURS WORKED
Base $38.38Fringe $14.66
+4 more occupation rates in this WD
Davis-Baconstate match
RI20260002 (Rev 2)
Open WD
Published May 18, 2026Rhode Island • Bristol, Kent, Providence +1
Rate
INSULATOR - PIPE & PIPEWRAPPER (INCLUDES APPLICATION OF ALL INSULATING MATERIALS, PROTECTIVE COVERINGS, COATINGS & FINISHES TO ALL TYPES OF MECHANICAL SYSTEMS)
Base $49.91Fringe $36.63
Rate
PER HOUR ADDITIONAL
Base $42.09Fringe $17.92
Rate
BASIC HOURLY RATE FOR 6 MONTHS TO 5 YEARS OF SERVICE AS VACATION PAY CREDIT
Base $64.52Fringe $38.44
+15 more occupation rates in this WD

Description

Specifications are available on the Town of Narragansett website at: www.narragansettri.gov

Advisory bid range

Pricing and bid posture

medium confidence
$316,256 - $374,822

Contractor-side estimate from visible notice metadata, NAICS/PSC, contract type, schedule hints, and BidPulsar workpaper assumptions. Not an IGCE, incumbent price, award value, or government budget.

Calibrate full bid price →
Floor
$316,256
Target
$334,663
Premium
$374,822
Labor
$167,120
Direct
$15,500
Burden
$112,136
Fee + reserve
$39,442
Target $334,663Hybrid workpaper with explicit assumptions4 modeled rows

This advisory bid range is visible page text for contractors and search engines: it summarizes the modeled floor, target, and premium bid posture for this solicitation.

Market snapshot

Baseline awarded-market signal across all contracting (sample of 400 recent awards; refreshed periodically).

12-month awarded value
$3,508,452,282
Sector total $3,508,452,282 • Share 100.0%
Live
Median
$350,000
P10–P90
$32,556$3,256,200
Volatility
Volatile200%
Market composition
NAICS share of sector
A simple concentration signal, not a forecast.
100.0%
share
Momentum (last 3 vs prior 3 buckets)
+100%($3,508,452,282)
Deal sizing
$350,000 median
Use as a pricing centerline.
Live signal is computed from awarded notices already observed in the system.
Signals shown are descriptive of observed awards; not a forecast.

Files

Files size/type shown when available.

BidPulsar Analysis

A practical, capture-style breakdown of fit, requirements, risks, and next steps.

Analysis is being generated for this notice. Check back shortly.
Federal Bid Partners

Service match

Optional support routes matched to this notice after the core solicitation details.

Need help writing this bid?
Route this notice into proposal, compliance, and submission support without burying the solicitation record.
Open proposal plans

Related hubs & trends

Navigate the lattice: hubs for browsing, trends for pricing signals.